Advance Steel – Status Control Inside Model And Drawings

In Advance Steel, the users can use the options to provide a Status level to both the drawing and the model elements and it is often described as Key Stages/Life Cycles inside the production process.

The Status system remains as part of the Fabrication data inside Advance Steel, it can contain levels/statuses which are included to it through the Management Tool (MT) System. Besides, comment levels are included to approve the status.

Various colors can be arranged while generating anything inside the MT. These can then be applied to provide colourisation/highlighting to the model. It is accomplished with the project explorer and the saved Query Feature.
Together with this, there exist a status level for drawings, the drawing system is segregated to the model elements, because drawings may not always remain at the equivalent status as the model, as for instance the model may be left for revision, the elements in the model are updated, but the drawings are not located at similar point. But at some point, they will obtain an adjustment, then a modification in status level of Reissued etc., then modifying to the same status as model at some point.

The vital fact is that a “STATUS” level, is not an adjustment to the drawing, it belongs to the present state of the drawing to the overall life cycle to the project, so the two systems are not same, but can be employed in combination to deliver a life cycle management to the system for Autodesk Advance Steel document and model management.


To get detailed idea on the different steps and operation, go through the following video presentations.