In Advance Steel, the users can
use the options to provide a Status level to both the drawing and the model
elements and it is often described as Key Stages/Life Cycles inside the
production process.
The Status system remains as part
of the Fabrication data inside Advance Steel, it can contain levels/statuses
which are included to it through the Management Tool (MT) System. Besides,
comment levels are included to approve the status.
Various
colors can be arranged while generating anything inside the MT. These can then
be applied to provide colourisation/highlighting to the model. It is
accomplished with the project explorer and the saved Query Feature.
Together
with this, there exist a status level for drawings, the drawing system is
segregated to the model elements, because drawings may not always remain at the
equivalent status as the model, as for instance the model may be left for
revision, the elements in the model are updated, but the drawings are not
located at similar point. But at some point, they will obtain an adjustment,
then a modification in status level of Reissued etc., then modifying to the
same status as model at some point.
The vital fact is that a “STATUS”
level, is not an adjustment to the drawing, it belongs to the present state of
the drawing to the overall life cycle to the project, so the two systems are
not same, but can be employed in combination to deliver a life cycle management
to the system for Autodesk Advance Steel document and model management.
To get detailed idea on the
different steps and operation, go through the following video presentations.
Read more
~~~~~~~~~~~~~~~~~~~~~~~~