adsense analytic

Showing posts with label BIM project. Show all posts
Showing posts with label BIM project. Show all posts

Tuesday, March 26, 2019

A position is vacant for a BIM manager

Job Description: Handel Architects is inviting application for a devoted and energetic BIM Manager to lead and manage the firm’s projects efficiently around the world.

The candidate has to perform inside a highly collaborative environment, with senior staff, on an extensive range of large and impactful urban projects, and involve as mentor and technical guide to all project teams.

The candidate will be liable for sustaining and advancing the existing BIM processes, content and standards supporting company’s daily practice, and make sure that the teams are satisfying these needs over the project life cycle.

Requirements:

• At least ten years of experience in Architectural practice on project teams at all stages of project development.
• Take part in the full cycle of three or more large scale built projects, involving collaboration with all most important disciplines, and in an important BIM capacity.
• Sound knowledge in Revit, visual programming and related third party capabilities.
• Well versed with performance analysis tools and process employed to BIM for energy consumption, solar study, view and quality control.

• Expertise with Rhino and visual programming, visualization process and their interoperability with other environments.
• Knowledge with developing and supporting an office wide infrastructure of: technologies, processes, workflows, employee training, policies and quality controls methods for BIM work on several projects.
• A discipline to govern all BIM related project team inquiries, and actively involved in sustaining a view of project requirements and current project alignment with established office wide practice.
• Dedication for better productiveness through process refinement and progress of automation. Adeptness with the related programming languages and knowledge of the APIs is an added advantage.

• Sound knowledge in oral, written and graphic communication necessary for engaging and efficient teaching, and an aspiration to help others improving their skills in these areas.
• Well-built self-directed motivation and judgment to arrange priorities and manage competing demands for achieving long range goals.
Besides salary, there are other benefits like health benefits, competitive PTO, parental leave, 401K match, reimbursement and mentoring for ARE exams, and Whiteboard Groups.
Please, send your application by clicking on this link andelarchitects.com
A position is vacant for a BIM manager
~~~~~~~~~~~~~~~~~~~~~~~~
Published By
Rajib Dey
www.bimoutsourcing.com
~~~~~~~~~~~~~~~~~~~~~~~~

Friday, January 11, 2019

Job for BIM Manager in Dublin

A position is vacant for an experienced BIM Manager to work in tandem with a leading main contractor through-out Ireland.

The prospective candidate should contain a contracting background performing on large scale developments for minimum 5 years.

Roles & liabilities:

• Arrange a framework for BIM execution that is aligned to the growing maturity of the business.
• BIM Centre of Excellence lead, liable for knowledge management and allocating best practice.
• Direct engagement with the Design Management community to support the drive for better governance of design management and integration with BIM processes.
• Assist to develop master information delivery plans and task information delivery plans, set up information structure and standards, agree output formats and authenticate compliance.
• Review and enhance internal systems for compliance with industry standards, e.g. filing systems, BIM procedures within IMS.
• Set out the proper BIM Digital toolsets for the company along with formation of the perfect software procurement model and supporting the related technical implementation.


• Develop operating methods for implementing new software (Revit, Navis works, Civils 3D).
• Interpret project specific EIRs to integrate these into supply chain assessments (Consultant and Contractor), develop CIRs for Tier 1 contractor to issue to key suppliers incorporating specific EiR requirements, organize BIM Execution plans and aid in pre-contract response to EIRs.
• Work in tandem with the project teams to set up information exchange processes, and CDE management.
• Provide direct support at Project level for exploring the benefits of 3D modelling eg. Design optimisation, Construction sequencing, Information management.



• Support the Work Winning teams in recognizing the best value design and construction for tenders and for responding/selling BIM Capability in Quality Submissions.
• Arrange training and awareness of BIM
Apply online irishjobs.ie
Job for BIM Manager in Dublin
~~~~~~~~~~~~~~~~~~~~~~~~
Published By
Rajib Dey
www.bimoutsourcing.com
~~~~~~~~~~~~~~~~~~~~~~~~

Thursday, August 16, 2018

NBS Chorus, the first cloud-based platform for BIM professionals

NBS Chorus belongs to a collaborative specification platform specifically useful for global design and construction. It facilitates the professionals to generate superior quality specifications proficiently.

With the application of cloud technology, the users will be able to obtain the latest software and global content at all times, enhancing collaboration and efficiencies over entire teams and minimize risk.

NBS Chorus facilitates the entire team to work in tandem with each other. It associates the people you require from any location, offers the entire team with perfect global standards and classifications and relates this all simultaneously in a platform developed for BIM on a global scale.

The capability to function inside a cloud-based software platform facilitates to collaborate with external organisations undertaking projects globally with the capabilities of the collaborative software.

This platform will facilitate to work more efficiently among Studios as well as with other consultants. One can get the ability to assess specifications not in isolation from the design/model, but as part of the design, will allow for more collaborative discussion with context.

As project specifications can be obtained from various design discipline in a single area, the effective collaboration will be created and it will eliminate the risk of gaps in the project specification as well as take out assumptions in design information that contains numerous responsible parties.


NBS Chorus presents structured content written and maintained to UK or Canadian practice and standards.
To get more details about NBS Chorus, visit www.theNBS.com

NBS Chorus, the first cloud-based platform for BIM professionals

~~~~~~~~~~~~~~~~~~~~~~~~
Published By
Rajib Dey
www.bimoutsourcing.com
~~~~~~~~~~~~~~~~~~~~~~~~

Wednesday, August 8, 2018

Benefits of 7D (Operations and Facilities Management) BIM

It is found that more than 90% of total building lifecycle costs are associated with facility maintenance and operations. The application of BIM in facility management is gaining popularity among real estate and facilitate managers.

BIM 7D provides the following benefits :-

Preventative Maintenance Scheduling: BIM is applied to organize and monitor maintenance activities effectively and properly with the use of the information concerning the building structure and equipment employed in the facility.

This type of protective maintenance works can enhance the performance of the building, minimize remedial maintenance and emergency maintenance repairs and raise the productivity of maintenance staff.

Sustainability Analysis: BIM is combined with other analysis & evaluation tools to monitor the performance of the building that is relative to particular sustainable standards to recognize the faults in the building systems. Facility’s sustainability program should be enhanced to match the sustainability goals in an efficient manner.

Asset Management: Assets of a building comprises of the physical building, its systems, equipment and surrounding environment. Asset management is effective in short-term as well as for long-standing planning for preserving the building assets properly.

The bi-directional Building Information Modeling (BIM) integration into asset management software facilitates superior visualization of assets and helps in the maintenance and operation of a facility.

Space Utilization Management: Facility professionals and department liaisons can employ BIM to control, monitor and allocate proper spaces and pertinent resources inside a facility effectively. BIM space management application is useful for planning renovation projects and future requirements, distributing space for utilizing each corner of the building perfectly and monitoring the effect of intended changes.

Disaster & Emergency Planning: BIM offers vital information of the building to enhance the effectiveness of disaster response plans and reduce any risk. BIM is combined with building automation system (BAS) to demonstrate where the emergency is situated inside a building, to discover feasible routes to the affected area and to determine other hazardous areas within the building throughout such emergencies.

Sourcehttps://ilovemyarchitect.com

Benefits of 7D (Operations and Facilities Management) BIM

~~~~~~~~~~~~~~~~~~~~~~~~
Published By
Rajib Dey
www.bimoutsourcing.com
~~~~~~~~~~~~~~~~~~~~~~~~

Wednesday, August 1, 2018

A Practical Guide to Adopting BIM in Construction Projects – A useful guide book for BIM professionals

A Practical Guide to Adopting BIM in Construction Projects is an exclusive e-book written by Mr. Bimal Kumar, Professor of IT in Design and Construction, School of Engineering and Built Environment, Glasgow Caledonian University, UK.

The book is considered as a useful resource for practitioners to implement BIM successfully in construction projects. The book combines background theory and practical ideas for BIM execution.

This book provides practical suggestions on how the digital transformation can be generated the benefits can be reaped successfully from BIM by providing more efficient and creative ways of working.

This book demonstrates the unique view of the major issues for implementing BIM in construction projects from a realistic point of view. It offers a synopsis of the key ideas and issues extracted from different guidance documents and resolves the more practical issues, makes an easy understanding of the more complicated and crucial problems of processes, standards and protocols which should be set for the successful implementation of BIM in construction projects. In so doing, it offers reader-friendly guidance to facilitate the engineer or student to completely understand the significances of the process and to ease the use of the principles and techniques in real scenarios.

The author demonstrates a balanced approach integrating adequate background theory and practical ideas to make sure the book is suitable and pertinent to practising engineers, architects, contractors and client organisations. The appendices arrange practical advice and material for BIM projects, handling various issues like compliance, project implementation plans and learning outcomes. Although much of the topic originates from the UK, it is equally suitable in any country where best practice is required.

To purchase the book online, click on the following link www.amazon.com

A Practical Guide to Adopting BIM in Construction Projects – A useful guide book for BIM professionals

~~~~~~~~~~~~~~~~~~~~~~~~
Published By
Rajib Dey
www.bimoutsourcing.com
~~~~~~~~~~~~~~~~~~~~~~~~

Friday, July 27, 2018

Implementation of BIM in construction industry – A brief analysis by Alan Lamont

In this video tutorial, Alan Lamont, Vice President, Digital Advancement Academies, Bentley Systems, provides good information on implementation of BIM in construction industry.

BIM implementation is gaining popularity among construction sectors since more and more decision-makers get the ability to recognize how by virtually prototyping the building under construction, they can evaluate the design more efficiently, attain more precision in construction as well as evaluate alternatives in respect of cost and other parameters.

With BIM, it is possible to utilize the resources and optimize the workflows and as a result the productivity and profitability are increased.

But there are some barriers for which BIM is not adopted full fledgedly in all construction projects.

The barriers comprise of five major factors ranging from intricacy in changing people’s habits, restricted applicability, interoperability issues, restricted budgets and slack in various operating standards.

To get more detail information, go through the following video tutorial.

Video Source: Geospatial World

~~~~~~~~~~~~~~~~~~~~~~~~
Published By
Rajib Dey
www.bimoutsourcing.com
~~~~~~~~~~~~~~~~~~~~~~~~

Friday, July 13, 2018

The role of BIM Execution Plan (BEP) for MEP firms

With advancement of BIM, the demand for BIM Execution or Implementation Plan is also increased. BEP facilitates every project stakeholder to get updated with the project. Now MEP firms extensively implement BEP for improved BIM Level 2 execution.

BEP becomes part and parcel for construction projects specifically large and complicated projects like BIM. The basic BEP plan is utilized to make sure that all the stakeholders, architectural, structural and MEP professionals remain on the equivalent page and proceed at the same predefined pace retaining the clear view in focus.


So, BEP in its nature signifies consulting insights on how BIM will be enforced across the project for each professional ranging from designer, MEP engineer, MEP consultant, or a MEP contractor as well as inter-disciplinary design teams and engineers.
How does BEP impact MEP firms?
Specifically MEP firms reap the most benefits from BEP on BIM coordination. Any MEP firm that deals with a complicated construction project plays a significant role across phases to remain organized. With a BIM implementation plan or a BIM consulting partner BEP is formulated easily to make sure that each stakeholder recognizes their part and can adopt the activities consequently and make out what should be anticipated from other disciplines.
• BEP Documents: The information provided in BEP documents comprise of a plan for BIM adoption, how the data in BIM files are generated, controlled, documented and distributed across the disciplines. When Mep Firms can access such information sets, their teams will to able to undertake decisions for fabrication, delivery at site and installation.
• Project Guide: Aside, when major deliverables and a guide to project milestones are evidently defined, MEP engineers and teams who participate in the project at later stages with regards to other design engineers, BEP plays a very important role in adopting up to date decisions.
• BEP for construction projects: BEP for the construction projects also comprise of practical working method with the details of filenames, abbreviations and acronyms, annotations, symbols in mark-up drawings (if any) and lots other used in the BIM model. The detailed plans in BEP with a guide simplify the task of MEP teams; particularly in formulating MEP coordination drawings and finalizing MEP layout.
Advantages of BEP to MEP firms: When BEP are designed with complete documents to integrate various teams and collaborate to accomplish the project in a systematic and phased manner. BEP provides benefits to MEP teams in the following ways.
• Superior communication and management
• Improved collaboration as per standards
• Reduce reworks
• Saving of time and costs
The role of BIM Execution Plan (BEP) for MEP firms

~~~~~~~~~~~~~~~~~~~~~~~~
Published By
Rajib Dey
www.bimoutsourcing.com
~~~~~~~~~~~~~~~~~~~~~~~~

Friday, June 22, 2018

The role of BIM in prefabrication period

BIM is used to provide digital representation of the building process in 3D with the scope of a 4D (time) and 5D (cost) of data to minimize errors, enhance effectiveness and decision-making.

With improved perceptibility and clarity throughout a project to ensure that things remain on the schedule that’s been dedicated to and within the calculated budget being proposed, BIM tools provide substantial ROI for architecture, engineering and construction (AEC) professionals.

Besides, base-level geometry of a structure, BIM comprises of spatial relationships; mechanical, electric and plumbing (MEP) components and the quantities and cost estimates for the required building materials. If any modification is made, associated objects are updated along with it, all in a centralized model so that each team member of the project can get access of that model.

BIM produces a broad, digital picture of a project to facilitate the project stakeholders to have clear view concerning what resources are essential and when, as well as reduce the chances of over- or under-estimating the time and money the project will require.

The objective of prefab and modular methods is to lessen the time required to fabricate a structure on the jobsite, as well as integrate MEP components into the panel or module while fabrication is going on. BIM contains these components in the entire building model and makes trade-to-trade coordination better.

In prefab and modular construction, assembly requirements are altered since the piece, panel or module design is calibrated. As soon as the design gets ready, BIM can generate visual-based manuals, in place of written instructions so that the workers can get a clear idea of the new steps for fabrication.

Building in the virtual space is incorporating the new technologies like virtual and augmented reality.

Virtual reality can offer an immersive understanding of the BIM model and a supplementary resource for AEC professionals to examine the design options and find out design errors.

AR facilitates to layer BIM models with real objects in the jobsite as a reference point during the assembly process and avoids the construction errors.

Source: constructiondive.com

The role of BIM in prefabrication period


~~~~~~~~~~~~~~~~~~~~~~~~
Published By
Rajib Dey
www.bimoutsourcing.com
~~~~~~~~~~~~~~~~~~~~~~~~

Wednesday, June 6, 2018

How 4D BIM add values to any BIM projects

In this exclusive BIM video tutorial, Fred Mills, the co-founder of the B1M, briefly describes the definition as well as the importance of 4D BIM on building information modelling (BIM) projects.

BIM stands for the technique for generating information models or data sets which are developed with graphical and non-graphical information in a common digital space called as a Common Data Environment (CDE). Plenty information is created with the advancement of the project phases unless the complete data set is passed on to the Client and/or end user at completion.

When an information model is generated, it is possible to add scheduling data to various components for producing perfect programme information and facilitating successive visuals of your project’s development. This process is known as 4D BIM.

5D BIM means combining in cost data with the purpose of providing support to cost planning and making estimates whereas the integration of information to support facilities management and operation is known as 6D BIM.

4D BIM comprises of time-related information that is related to various components of an information model. For a particular element or work area, that may contain details on its lead-time, construction and installation period, curing and drying allowances, sequencing or its interdependencies with other areas. With this data incorporated, planners will be able to instantly develop perfect programmes for projects on the basis of one trustworthy source of consolidated information. The particular activities and items inside those programmes can be associated with their graphical representations.

The addition of time-related attribute data also allows formation of 3D visuals concerning a project’s development that demonstrates how it will be built up and how both the structure and surrounding site will be visible at each phase. It is very effective in the context of planning work in a secure and rational way to enhance the effectiveness on job site. By accessing programme and visual information, project teams get the ability to efficiently prototype assets in a virtual environment early and give quick feedback on the modification of design or methodology to their colleagues.

Such an approach facilitates to redress last minute on-site design co-ordination and rework, finally removing waste from the delivery process and helping to accelerate the process. It can simplify the cost base for project teams and enhance their strength, whereas minimizing overall delivery costs for Clients.

4D BIM is also very suitable for disclosing the influence of built assets with local Stakeholders throughout delivery and completion of project. Everyone can view and perceive a clear understanding of how the asset will look.

4D can evaluate the usefulness of schemes at any phase of a project. It’s also effective throughout tendering if it becomes necessary to instantly understand a project or illustrate and create confidence around your methodology inside of the selection process.

To get more clear ideas, go through the following video tutorial.

Read more


~~~~~~~~~~~~~~~~~~~~~~~~
Published By
Rajib Dey
www.bimoutsourcing.com
~~~~~~~~~~~~~~~~~~~~~~~~

Monday, November 20, 2017

IMAGINiT Clarity 2018.1 is just launched for BIM professionals

The leading software developer IMAGINiT Technologies launched IMAGINiT Clarity 2018.1. Clarity facilitates the building project teams to employ Autodesk Revit software model data in new and intelligent ways so that building information modeling (BIM) teams can achieve superior control on the models and save huge time and effort.

With superior access to important metrics facilitates our customers to recognize issues related to any of their models across all active projects. This, together with clarity’s current and new task automation features, empowers BIM teams to get the complete view of their model health for more consistent results.

Key New Features
With IMAGINiT Clarity, the teams get the ability to take superior decisions with deeper understandings of the projects containing superior analytics, multiple model views and graphical dashboards. Given below, some exclusive features of the software :-
• Extended BIM Analytics and a new graphical dashboard facilitates BIM coordinators to look at prime metrics over projects and arrange company-wide standards for a sound understanding of model data. These analytics also facilitate BIM teams to control modeling issues in a superior manner which range the number of Revit Warnings, file size, and 50 other metrics to determine model health over time.

• Superior Collaboration for Revit Integration provides the capacity to computerize the tasks like importing updated models from project partners. The process can also be automated to back-up data from the Cloud to A360 and drive it to other software programs like ProjectWise.

• Additional Task Management Features makes it possible to export data to Microsoft Excel, and filter tasks through server so that BIM coordinators can handle the workload on their hardware whereas processing numerous jobs.
IMAGINiT Clarity 2018.1 is just launched for BIM professionals
To get more updates on IMAGINiT’s Clarity software, visit imaginit.com

~~~~~~~~~~~~~~~~~~~~~~~~
Published By
Rajib Dey
www.bimoutsourcing.com
~~~~~~~~~~~~~~~~~~~~~~~~


Tuesday, September 19, 2017

AECOsim Building Designer CONNECT Edition is the best BIM Modeling Software on the market

Bentley Systems, Incorporated, just released AECOsim Building Designer CONNECT Edition. It is the Bentley’s building information modeling (BIM) application that is specifically developed for creating projects of significant size and/or engineering complexity. These are normally defined by the challenges of integrating vertical construction and horizontal infrastructure (like roads, railways, utilities, etc.).

There is a useful feature called GenerativeComponents inside AECOsim Building Designer that offers computational design abilities to delve into iterative design ideas and embed design intent with design constraints and relationships for making design quality and performance superior.

The new AECOsim Building Designer CONNECT Edition allocates a wide-ranging modeling environment with all of Bentley’s CONNECT Edition applications so that the process becomes simple for the engineers and architects to exchange complicated data that leads to loss of information and frequent translations, or even recourse to force-fitting a BIM application apart its premeditated use to model geometry, which is not possible with BIM intelligence.
AECOsim Building Designer CONNECT Edition combines the work of architects, structural engineers, and MEP engineers in a single application, and now expands its scalability with the help of CONNECT Edition’s wide-ranging modeling environment. This latest release offers consistent, translation-free, intra-operability with Bentley’s full multi-discipline portfolio of design, analytical, and construction modeling applications.

All CONNECT Edition applications, along with MicroStation CONNECT Edition, take advantage of the deliverables production automation native in the CONNECT Edition’s documentation center. The documentation center significantly enhances the reliability, quality, and effectiveness of drawing set organization. AECOsim Building Designer can also allow for reality modeling, through which present conditions are procured with photos and/or scans and transformed into engineering-ready reality meshes with Bentley’s ContextCapture, delivering the actual geo-coordinated context directly into the AECOsim design environment.

AECOsim Building Designer CONNECT Edition facilitates the users to enhance their productivity and to collaborate over multiple disciplines by distributing content and data in a constant workflow via a widespread modeling atmosphere. With this latest version of AECOsim Building Designer, it becomes possible to collaborate on projects of any scale or multidisciplinary complexity, and automate the formation of deliverables for all stakeholders.


To gather more information about AECOsim Building Designer CONNECT Edition, please visit bentley.com

AECOsim Building Designer CONNECT Edition is the best BIM Modeling Software on the market


~~~~~~~~~~~~~~~~~~~~~~~~
Published By
Rajib Dey
www.bimoutsourcing.com
~~~~~~~~~~~~~~~~~~~~~~~~

Wednesday, December 21, 2016

MagiCAD V2016.11 For Revit, AutoCAD

The most updated version of MagiCAD for Revit and AutoCAD alias version 2016.11 is just launched to make the MEP Design Process more superior. The productivity workflows are significantly improved with this new version. MagiCAD provides a wide-ranging and innovative solution toward all ventilation, piping and electrical Building Information Modelling, design and calculations requirements. MagiCAD 2016.11 is compatible with Revit 2017-2016 and AutoCAD 2017-2013.

With MagiCAD 2016.11 for Revit, the users can get a complete calculation solution on MEP work through Revit platform. The users will be able to execute all the calculations through MagiCAD on native Revit families. The new version comprehensively combines with native Revit units of measurement, improves drawing legends for quantity take-off documents and bills of materials, and offers easy functions for tracing probable errors and failed objects in the model once IFC export is completed.

Besides, MagiCAD2016.11 for Revit presents various intelligent new tools and enhancements for ventilation, piping and electrical design, together with substations and wall boxes as new product types. Significant enhancements like system performance, capabilities for DXF export and support for assembled supports and hangers are included in MagiCAD 2016.11 for Revit toward the design of support and hanger systems for ducts, pipes and cable trays.

Various complicated data processing tasks and project export methods become automatic in MagiCAD 2016.11 for AutoCAD. There are some exciting and new features like a Quick-Start Project Setup Wizard for simple and rapid setup of projects with localized settings, constant update of all model drawings all together, Find & Replace functions for all textual parameters, along with exporting projects to IFC format in batches via automated functions. Besides, MagiCAD 2016.11 for AutoCAD provides new tools, measurements and enhancements for ventilation, piping, electrical and systems design.

MagiCAD optimizes MEP design with the use of Europe’s biggest product model database that includes more than one million actual products and product variants from 220 leading manufacturers all over the globe. Each model inside the database contains precise dimensions and wide-ranging technical data.

For more information, visit www.magicad.com

MagiCAD v2016.11 for Revit, AutoCAD

~~~~~~~~~~~~~~~~~~~~~
Published By
Rajib Dey
~~~~~~~~~~~~~~~~~~~~~

Wednesday, October 26, 2016

Spot – The Newest Web-Based Product Sustainability Information Tool For BIM

UL just launched SPOT, a web-based product sustainability information tool that will simplify the process for choosing credible green products and facilitate the design community for using that information into the Building Information Modeling (BIM) workflow. Presently, there are over 40,000 products and SPOT database will provide huge benefits to the architects, designers and specifiers to recognize products through sustainable attributes, MasterFormat product codes and building rating system credits like LEED v4 and the WELL Building Standard. The app version of Spot is also available in the Apple App Store and Google Play.

Besides, UL is going to create an add-in that will allow AutoDesk Revit users to obtain product data from SPOT and allocate it directly to their project. This will provide exceptional perceptibility into authentic green product information, allowing superior precision in green building reporting and certification to regional, national and international building standards.

Spot integrates various product attributes to make the selection method simpler for architects and designers, and will change the way certification data is transmitted into BIM project designs.

To gather more information, visit ul.com/spot or send mail to sarah.partridge@ul.com

Ref.: www.prnewswire.com

Spot – The newest web-based product sustainability information tool for BIM

~~~~~~~~~~~~~~~~~~~~~
Published By
Rajib Dey
~~~~~~~~~~~~~~~~~~~~~

Monday, September 5, 2016

How BIM is utilized in World’s largest Crossrail design project in Europe

This article shows how BIM (Building Information Modeling) was utilized in designing the Crossrail project that is considered as the biggest construction project in Europe.

Under this project, the enormous railway is planned to relieve jamming across London, with a high-frequency and high-volume railway spreading over 62 mi (100 km) of new tunnels from Reading and Heathrow in the west to Shenfield and Abbey Wood in the east.

Bentley Systems undertakes the responsibility to implement BIM on this project and they declared that the common data environment (CDE) for the project has been officially transferred to the cloud.

The CDE is set up on a hybrid cloud-computing platform leveraged with Microsoft Azure and controlled by Bentley’s AssetWise software.

This will facilitate controlling the engineering and asset information associated with such a huge project and as well as permit project members to obtain a thorough and federated view of the railway in a digital environment.

With the use of BIM, project delivery and asset lifecycle information management process become superior and cost is reduced significantly.

BIM uses its own style of workflow that always maintains the exact speed for international project teams. All the informations are preserved in a CDE on a cloud-based platform which make sure that each person can avail this information in a realistic and trustworthy manner.

By transferring CDE to the cloud platform, it will be relatively beneficial in the future phases of 5D modeling for efficient facilities management.

The Crossrail railway project is expected to be completed in December 2018.

To get more information on this project, visit www.crossrail.co.uk


~~~~~~~~~~~~~~~~~~~~~~
Published By
Rajib Dey
~~~~~~~~~~~~~~~~~~~~~~

Tuesday, June 7, 2016

The New BIM guidelines for Vertical and Horizontal Construction by The Massachusetts Port Authority

Some days ago, The Massachusetts Port Authority (Massport) published a series of documents with the intension of incorporating Building Information Modeling (BIM) into new construction, substantial renovation, and significant maintenance and improvement projects. The documents consist of road maps for Vertical and Horizontal Construction. There exist an Appendix A containing BIM Uses Guideline, and a BIM Roadmap poster. All these can be accessed online at the Massport Capital Programs Resource Center (www.massport.com/business-with-massport/capital-improvements/resource-center). The release of the guidelines belongs to the Massachusetts Integrated BIM Initiative. It is an endeavor to ascertain the viability of certifying a single BIM protocol for all Massachusetts agencies and authorities.

The Massport guidelines are ideal for all vertical and horizontal construction projects and tenant alteration application projects. Once the projected construction costs of a project enhance, the level of BIM integration usually rises also. For horizontal utility and runway projects, the level of BIM integration is not affected by cost. The Design and construction professionals who intend to bid on Massport projects, must adapt themselves with the guidelines.

In 2014, the AIA and AGC launched the 2014 Level of Development Specification. It is now integrated into Massport BIM projects. Besides, leading designers and contractors will require to appoint BIM managers, who will perform with Massport’s Design Technologies Integration Group to make sure that the BIM guidelines are pursued during every stage of a project.

Massport guidelines include some portions of the DCAMM guidelines which were launched in 2015 for Design and Construction. As for instance, Appendix A of each set of guidelines consists of similar-to-identical BIM Use Cases along with brief directions for applying the BIM Execution Plan Template. Other guidelines contain modeling requirements for present conditions, system authoring, analysis and reporting, and design and constructability reviews.

The new BIM guidelines

~~~~~~~~~~~~~~~~~~~~~~
Published By
Rajib Dey
~~~~~~~~~~~~~~~~~~~~~~

Saturday, May 21, 2016

The newest CIC BIM Standards for Hong Kong

InteliBuild formulates and publishes newest CIC BIM Standards in association with The Hong Kong Construction Industry Council (CIC), Task Group on Establishment of Industry Standard for BIM Implementation. One can download The Hong Kong CIC BIM Standards from this link Download Here (http://www.hkcic.org).


The BIM standards approach some significant issues which are creating barriers to implement BIM in Hong Kong.

The CIC BIM Standards are developed on the basis of the existing BIM standards of the Hong Kong Housing Authority (HKHA), MTR Corporation Limited (MTRC) andHong Kong Institute of Building Information Modelling (HKIBIM).

The Standards are written following the best regional and international standards and practices along with PAS 1192BCA Singapore BIM Guide and the BIM Forum LOD Specification.

Client Leadership: The CIC BIM Standards are adopted to facilitate the client to identify, control and evaluate BIM deliverables with architects, engineers, surveyors and contractors. The CIC BIM Standards is developed on the basis of the planning, execution, management and examination concerning the application of BIM on a project which necessitate client direction, involvement and leadership. In order to implement BIM on a project, it will also need design consultant and contractor collaboration.

How Architects and Engineers embrace BIM: Building Information Modelling is a useful method for developing and controlling building data throughout its design, construction and operations. The BIM method requires that architects and engineers employ BIM software for designing any projects.

The successful implementation of BIM completely depends on proper BIM training. It is essential that the architects and engineers should undergo proper training on how to employ BIM procedures and tools to develop their design drawings in-house.

BIM Project Execution Plan and Professional BIM Manager: The CIC BIM Standards are adopted for the purpose of outlining the scope of work associated with BIM, the liabilities of the project participants and the deliverables from the BIM process by employing a BIM Project Execution Plan. If a client does not contain sufficient knowledge for identifying or managing the application of BIM, a BIM Manager can be employed to deal with the employers needs as well as a BIM Project Execution Plan (BIM PXP or BEP).

The BIM PXP should plan the broad vision for the project and offer execution details for the consultants and contractors to maintain all through the project. The BIM PXP must be formulated at the initial stage of the project and upgraded during the project when design team members, contractors and sub-contractors are selected.

The client must assign a professional BIM Manager to guide and support the BIM process. The BIM Manager belongs to an architect, engineer, surveyor or contractor or a certified independent professional BIM Manager with appropriate practical construction knowledge and design coordination experience.


~~~~~~~~~~~~~~~~~~~~~
Published By
Rajib Dey
~~~~~~~~~~~~~~~~~~~~~

Thursday, March 17, 2016

The newest CIC BIM Standards for Hong Kong

InteliBuild formulates and publishes newest CIC BIM Standards in association with The Hong Kong Construction Industry Council (CIC), Task Group on Establishment of Industry Standard for BIM Implementation. One can download The Hong Kong CIC BIM Standards from this link Download Here (http://www.hkcic.org).


The BIM standards approach some significant issues which are creating barriers to implement BIM in Hong Kong.

The CIC BIM Standards are developed on the basis of the existing BIM standards of the Hong Kong Housing Authority (HKHA), MTR Corporation Limited (MTRC) and Hong Kong Institute of Building Information Modelling (HKIBIM).

The Standards are written following the best regional and international standards and practices along with PAS 1192BCA Singapore BIM Guide and the BIM Forum LOD Specification.

Client Leadership: The CIC BIM Standards are adopted to facilitate the client to identify, control and evaluate BIM deliverables with architects, engineers, surveyors and contractors. The CIC BIM Standards is developed on the basis of the planning, execution, management and examination concerning the application of BIM on a project which necessitate client direction, involvement and leadership. In order to implement BIM on a project, it will also need design consultant and contractor collaboration.

How Architects and Engineers embrace BIM: Building Information Modelling is a useful method for developing and controlling building data throughout its design, construction and operations. The BIM method requires that architects and engineers employ BIM software for designing any projects.

The successful implementation of BIM completely depends on proper BIM training. It is essential that the architects and engineers should undergo proper training on how to employ BIM procedures and tools to develop their design drawings in-house.

BIM Project Execution Plan and Professional BIM Manager: The CIC BIM Standards are adopted for the purpose of outlining the scope of work associated with BIM, the liabilities of the project participants and the deliverables from the BIM process by employing a BIM Project Execution Plan. If a client does not contain sufficient knowledge for identifying or managing the application of BIM, a BIM Manager can be employed to deal with the employers needs as well as a BIM Project Execution Plan (BIM PXP or BEP).

The BIM PXP should plan the broad vision for the project and offer execution details for the consultants and contractors to maintain all through the project. The BIM PXP must be formulated at the initial stage of the project and upgraded during the project when design team members, contractors and sub-contractors are selected.

The client must assign a professional BIM Manager to guide and support the BIM process. The BIM Manager belongs to an architect, engineer, surveyor or contractor or a certified independent professional BIM Manager with appropriate practical construction knowledge and design coordination experience.


~~~~~~~~~~~~~~~~~~~~~
Published By
Rajib Dey
~~~~~~~~~~~~~~~~~~~~~