adsense analytic

Showing posts with label 2D BIM. Show all posts
Showing posts with label 2D BIM. Show all posts

Friday, March 24, 2017

AutoCAD 2016 Tutorial On Cameras, Materials, Lighting And Rendering

Learn the detailed process for creating a 2d house plan as well as 3d model of the house with the use of AutoCAD by going through this AutoCAD video tutorial.


The video sheds light on the following topics :-
Generating Cameras
Using Materials
Lighting
final Preview of the project
In this tutorial, AutoCAD 2016 is used.


AutoCAD 2016 Tutorial on cameras, materials, lighting and rendering

~~~~~~~~~~~~~~~~~~~~~
Published By
Rajib Dey
www.bimoutsourcing.com
~~~~~~~~~~~~~~~~~~~~~~

Saturday, May 3, 2014

MagiCAD for Revit and AutoCAD

MagiCAD for Revit and AutoCAD provides maximum efficiency and productivity in MEP design. Adding MagiCAD's clever automated capabilities to your Revit MEP or AutoCAD makes HVAC and electrical design faster and easier, and at the same time enables new levels of reliability, accuracy and quality.

MagiCAD's Building Information Modelling capabilities improve efficiency and save money at every stage of the project. When the operation of MEP systems is modelled and tested before the actual construction begins, the systems can be installed as planned without costly surprises on site.
 
  

~~~~~~~~~~~~~~~~~~
Published By
Arka Roy
www.bimoutsourcing.com
~~~~~~~~~~~~~~~~~~

Monday, January 13, 2014

Melchin, Director of Architectural Development in FSR Inc, will conduct a brief session focusing on benefits of BIM

Integrated Systems Europe (ISE), will organize a thorough educational program along with a presentation by Jon Melchin, who performs as the Director of Architectural Development in FSR Inc. Melchin, is also an proficient speaker and a Passport Provider with the American Institute of Architects Continuing Education System (AIA-CES). He works nationwide with the architectural and design community to provide the specification of FSR products. Melchin has also written plentiful articles which are published in international trade publications focusing on the construction and audiovisual industries. He gathers more than 12 years of experience in the AV business.

Melchin will provide an expert opinion on the benefits of Building Information Modeling (BIM). The presentation is taken place on 5th February, 2014 at 11:30 – 12:30 in Room D204 of the RAI.

Melchin will share his professional experience working with the architectural industry that BIM covers the 3D illustration of the physical products and functional characteristics concerning a structure to produce a collective knowledge store for all the team members associated with the design phase. The session will useful for the architects as well as interior designers, engineers, contractors, facility owners, AV consultants and system integrators. Conversations will focus on the scopes for AV professionals to be associated with the ground level of a project, and discover an authentic project highlighting advantages of BIM.

“The ‘I’ in BIM denotes to ‘Involvement’. “This presentation will call the members of the spectators to take part in a conversation concerning all the advantages of BIM and all the people that reap the benefit from its execution.

~~~~~~~~~~~~~~~~~~~~
Published by Tuhin Maity
CAD Drafter & Designer
www.caddraftingservice.net
(Most efficient CAD Drafting Services (raster to vector) using CAD, MicroStation, VectorWorks, etc)

Wednesday, November 16, 2011

How project stakeholders can apply BIM in their work process


BIM can be applied as a work process and means of communicating with one another in the project delivery method to illustrate the end product (the model itself).
BIM generated a virtual process that covers all characteristics, disciplines, and systems of a building inside a single, virtual model facilitating all project stakeholders to work together more precisely and competently. Thus BIM creates a collaborative design process.
After the creation of the model, team members are continuously clarifying and regulating their portions in accordance with owner preferences, system's adaptability and design intention to maintain the accuracy of the model before the commencement of the actual project. If any modification is made by the project team members, it affects the entire model, creating continuous communication
After that the model itself is utilized to exchange information for design concepts to the owner. The model is also applied for estimating materials take-off for cost estimation and for conflict detection to electronically verify the proper designing of the building system. BIM can trim downs change orders by making changes electronically rather than on the job site which can get a huge saving in time and money for project schedule and budget.
Design information from all disciplines as for example from architectural designs and specifications to structural and mechanical systems information such as HVAC Ducting, piping and structural slabs, columns and shear walls are provided in the BIM database. The database includes and combines all elements of a finished building to one main database of linked project information. If any, the BIM database would mechanically rearrange all connected elements implanted in the interrelated database to communicate with any changes occurred with one element of the design.  A BIM database can surpass it’s 3D modeling capability and perform for 4-D (construction scheduling) and even 5-D (cost flow analysis). The database could significantly lessen waste in construction as well as time delays raised  by RFIs and change orders. 
BIM has also shifted time spent in various phases of design, placing more emphasis in the initial design phases and less in the construction documentation phase. Whereas with traditional CAD processes the bulk of the time was spent preparing construction documents, BIM requires more time up front, fully develop the design and model. When a BIM project goes into construction documentation, all that’s left to do is decide where to cut sections through the building and print the documents.

BIM can flawlessly gather in and incorporate the input and flow of information among design and construction professionals to make the entire process more efficient and reduce delays and cost overruns.
BIM can characterize a design as objects in the form of indistinct and undefined, generic or product-specific, solid shapes or void-space oriented (like the shape of a room), which contains their geometry, relations and attributes. The geometry possibly will be 2D or 3D. The objects may be conceptual and are constructed detailed. A building model is described by compiling together these objects. If an object is modified or moved, BIM tool then starts to dig out diverse views from a building model for drawing production and other application. These diverse views are mechanically constant i.e. the objects are all of a constant size, location, specification. Drawing uniformity reduces many inaccuracies as each object instance is defined only once.
Modern BIM technology identifies objects parametrically. Here the objects are identified as parameters and relations to other objects, in order that if a correlated object is modified, this one will also. Parametric objects mechanically reconstruct themselves in relation to the rules implanted in them. The rules are uncomplicated, involving a window to be wholly within a wall, and moving the window to the wall, or complex defining size ranges, and detailing, such as the physical connection between a steel beam and column. 



Posted by Rajib Dey
Business Development
rajib@jobs2india.com
Global Associates (Pioneer Company in 3D modeling with BIM & Sketchup)

visit our BIM sites

Monday, November 14, 2011

MEP engineers can make their pre-fabrication process more efficient with BIM based pipe-spool drawing

Spool drawings are assembly drawings which contain comprehensive manufacturing and fabrication information for each unique “spool piece”. Piping spools are generally represented in symbolic isometric drawings. Spool drawings are produced from a BIM model in 3D representation, line representation, and symbolic form along with 2D plans, sections and isometric views. BIM can automatically assign spool assembly drawings with bill of material data.



The piping spool drawings can be utilized for accurate pre-fabrication off-site / on-site compliant with contractors’ pre-fabricating standards and preferences.



A spool drawing may contain dimensions and angles, a bill of materials, and manufacturing information.

Spool drawings provide the following information :-
  • 2-D or isometric view of the spool piece producing adequate features for manufacturing.
  • Sections are given if necessary.
  • Bill of material for fabrication
  • Field installation information, for example a line tag number and field tie-in numbers
  • Suggest support spacing

Posted by Rajib Dey
Business Development
rajib@jobs2india.com
Global Associates (Pioneer Company in 3D modeling with BIM & Sketchup)

visit our BIM sites
www.bimoutsourcing.com
www.bimcoordination.com

    Tuesday, November 8, 2011

    BIM based shop drawing shows how the building structure will perform at the early stage of design

    Now-a-days shop drawings are considered to be the part and parcel of every construction project. The contractor, supplier, manufacturer, real estate developer, subcontractor, or fabricator create shop drawing to be utilized for pre-fabricated components like elevators, structural steel, trusses, pre-cast, windows, appliances, cabinets, air handling units, millwork etc . Shop drawings generate enormously vital information about measures and specifications of pre-fabricated components. MEP engineers also require the installation and coordination shop drawings that range from sheet metal ductwork, piping, plumbing, fire protection, and electrical.

    The shop drawing refers to the drawn version of information provided by the Manufacturer or Contractor. These informations are exposed in the construction documents. The shop drawing is required to provide details of the fabrication and/or installation of the items to the manufacturer’s production crew or contractor's installation crews.

    The shop drawing is the only place in the project document where all the connection details are shown with specifications to resolve connection issues. As for instance, a properly designed BIM wall system facilitates a much larger percentage of material to be pre-cut to accurate dimensions off-site, which lead to considerable savings in material and labor.



    Now with BIM or Building Information System, the contractor can produce 3D shop drawings in which a 3D model can be directly applied for assembly and installation to forecast how the building structure will perform at the early stage of design. A 3D shop drawing contains huge database of information which can be applied for selecting the best construction technique to achieve the best possible output. To get rid of future design inconsistencies and radical changes as the general contractor arranges the BIM model while integrating shop drawings from the different trades, the architects and engineers evaluate shop drawings to ensure that the contractors, manufactures and suppliers have understood the design objective in the same sense.
    The different kinds of shop drawings :-

    • SHOP / COORDINATION DRAWINGS
    • Coordinated HVAC Shop Drawings
    • Sheet Metal Fabrication Shop Drawings
    • Piping Shop and Fabrication Drawings
    • Coordinated mechanical Room Shop drawing
    • Coordinated plumbing shop drawing
    • Electrical Shop Drawings
    • MEP Coordination Drawings
    • Fabrication spool drawing
    • Sleeve & Rough opening drawing
    • 2D mechanical coordination drawing
    • MEP(3D)/BIM (4D) Mech coordination drawings

    Process :-
    Submit →Coordinate→Approve→Fabricate→Install

    Posted by Rajib Dey
    Business Development
    rajib@jobs2india.com
    Global Associates (Pioneer Company in 3D modeling with BIM & Sketchup)

    visit our BIM sites
    www.bimoutsourcing.com
    www.bimcoordination.com

    Saturday, November 5, 2011

    BIM and benefits of owner

    The owner should embrace BIM to reap the benefit of a well-organized and extremely coordinated method of project delivery. Project schedules are also curtailed and overall project costs is decreased.

    A BIM model contains huge database of vital information and the owner can utilize these information for analysis and decision making. The database is repetitively updated and filtered during the life cycle of the model. Besides modification can be made at a single location in spite of how many times the data is presented or distributed. The recurrence of requesting, parsing, assembling and transmitting information among team members at the different arenas of a model’s life is significantly decreased or removed. This leads to improved communication between team members and more apt reply to owner concerns or suggestions.

    BIM generates coordinated construction documents which can enhance the efficiency of the design and construction procedure. The owner can gain huge cost saving as the project scheduled is accelerated to a great extent.

    The owner can apply BIM at pre-design phase and expand it during the design, bidding, construction, occupancy and finally decommissioning of the building.

    BIM plays a key role in allocating data for analysis and simulation. BIM makes it possible to develop the amount and types of project analysis. This may vary from early investigation of building energy efficiency throughout conceptual massing, to structural/mechanical/electrical load analysis all through design, quantity take-offs throughout the project bidding, shop drawing review/fabrication all through construction, or even facility asset management throughout occupancy. The owner obtains more value by allocating different analyses to be executed with the transmission of data. This is applicable where numerous iterations of an analysis are replicated and purified at different phases of the BIM lifecycle.

    Some exclusive benefits of owner:
    • Owner gets the advantage of informed decision-making with the high-tech analysis of building systems, alternative materials, equipment, and technologies
    • The owners get an idea about the estimation of the materials and the sequence of work.
    • BIM delivers the best 'what if' situation and facilitates the owner to pick up the best one.
    • Solve the constructability issues.
    • Trim down contractor doubt facilitating a more precise cost representation and more reliable bids.
    • Assist project team to build up a realistic and unified phasing plan.
    • Minimize general project delivery time throughout the design stage in addition to the construction phase.
    • Enhance overall accuracy of project documentation.
    • Facilitate the analysis of sustainable design alternatives and cost comparisons.
    • Generate perfect and well-timed information instantly available to team members at several locations, with the construction site.
    • Makes the way to get better asset management.
    • Presents a mechanism for improved building and equipment maintenance.

    Posted by Rajib Dey
    Business Development
    rajib@jobs2india.com
    Global Associates (Pioneer Company in 3D modeling with BIM & Sketchup)

    visit our BIM sites
    www.bimoutsourcing.com
    www.bimcoordination.com

    Wednesday, November 2, 2011

    How BIM make the precast concrete process easier for structural engineers

    Precast concrete is a process associated with construction where concrete is cast in recyclable moulds and alleviated in a controlled environment. It is then transferred to the construction site and lifted and fixed in the structure.

    BIM provides some great benefits to owner, architect, structural engineer, precast fabricator and erection crews who mutually work in a prescast construction process.

    BIM technology can be applied to improve the quality of precast engineering design regarding drawings and exactness & consistency of the documents. Fabrication and erection are essentially error-free, and the effort required for checking drawings has declined drastically.

    By applying BIM precast fabricator can shorten lead times for preparing their shop drawings rapidly.

    BIM contains a huge database of information which can be utilized to improve the productivity of design documentation from project to project.

    The most significant benefit of BIM is that the software decreases engineering cost and cost of rework caused by errors. Besides BIM develops precision in cost estimating, decreases engineering lead time to a great extent, provides support for automation in production.

    BIM facilitates design and detail of precast elements with complex geometries in short times and remove the geometry or connection errors and time raised on checking and vetting drawings during fabrication or erection of precast elements.



    From a BIM model all the information are circulated in both engineering and in production in preparing precast shop drawings to pre-build a precast project in the virtual world . All geometry, details, and connections within the model are properly placed and coordinated.

    BIM is applied to evaluate prospective inconsistencies or project obstacles in the model, in order to determine and resolve these earlier to issuing drawings for construction. The BIM technology minimize the chances of misaligned connections, inaccurate architectural features and geometry conflicts, to make sure that shop drawings are generated without any in depth checking or cross coordination connecting drawings.

    Any changes in the precast concrete project like revising wall panel reinforcement from rebar to mesh, moving and adjusting the sizes of mechanical blockouts, revising some lift hooks, and minor changes to some connections to make erection simpler for site personne, requested by the architect, the owner, and the precast manufacturer, can be put into the model and all the related drawing are updated automatically. This is made possible with the parametric features of the BIM model.

    Within a BIM model, the documentation is generated quickly and inexpensively to facilitate the creation of various reports and drawings which can depict the precise information requirements of the various Consumers.

    Advantages of BIM for precast concrete :-

    • Model the overall geometry;
    • Take up design changes with a minimum of rework in organizing and reconciling different drawings;
    • Model any missing custom components (reinforcement details, connections details, embeds);
    • Make 3D visualization of the project to facilitate check for and evade design errors. This is useful for observing complex and congested arrangements of embeds, reinforcing and prestressed strands;
    • Production of schedules and shop drawings to improve productivity for precast structures in as automated a fashion as could be achieved;
    • Visualize the structure, purposely to present the spatial precast elements in three dimensional views to the owner;

    useful link :
    PCI BIM Committee Presents the Benefits of openBIM to the Precast Industry

    Tracking Precast Pieces

    Posted by Rajib Dey
    Business Development
    rajib@jobs2india.com
    Global Associates (Pioneer Company in 3D modeling with BIM & Sketchup)

    visit our BIM sites
    www.bimoutsourcing.com
    www.bimcoordination.com

    Tuesday, November 1, 2011

    Tekla Releases BIMsight 1.3 for imporved collaboration in construction industry

    Tekla unveils a new imporved version known as BIMsight 1.3. Tekla BIM is a BIM (building information modeling) environment designated for contractors, structural engineers, steel detailers and fabricators, as well as concrete detailers and manufacturers.

    Tekla BIMsight can be shared and downloaded over the internet at free of cost. Tekla BIMsight 1.3 facilitate the project parties to get the appropriate information from the different models and address the feasible issues. With the coloring function options users are able to choose colors for models or model objects, alongwith transparency. The support for layers simplifies the process of filtering the revelant data and the support for units (SI and Imperial) keep the information easily understandable.

    The latest version will empower the Tekla BIMsight users to exchange notes in open BCF format and this will enhance the collaboration phase to a great extent. Tekla launched first version of this unique software application for building information model-based construction project collaboration in February 2011.

    Tekla BIMsight has been successful in the form of a rapidly increasing user base of construction professionals and favorable reviews. Tekla provides most sophisticated BIM tool to be applied with any construction project and reap the benefits of timely project delivery and fewer RFI's.

    Tekla BIMsight can be applied for design coordination in all BIM projects varying from big and small.


    Download Tekla BIMsight 1.3 software for free here.
    Any body can get help from a unique Video tutorials and an online customer community for visualizing and communicating with building information models.

    Posted by Rajib Dey
    Business Development
    rajib@jobs2india.com
    Global Associates (Pioneer Company in 3D modeling with BIM & Sketchup)

    visit our BIM sites
    www.bimoutsourcing.com
    www.bimcoordination.com

    Monday, October 31, 2011

    BIM provides digital fabrication of structural steel

    BIM is very useful for the digital fabrication of structural steel. BIM can model entire steelwork structures in 3D along with last notch, plate and bolt to facilitate the fabricators in reviewing a 3D steel structural model right from the fabricated components. All detailed information as well as the drawings, material list and other data are automatically generated from the model. The various data can then be transmitted to production planning and automation systems. Such automated routine tasks permit the fabricator more time to focus on the principle precast design and detailing decisions.

    A purpose-built building information model can nourish the manufacturing process as the design model contains all the geometry related with structural steel. The design informations are exported to a CIS/2 file (an industry standard data format for replacing steel information) to be used again in a steel detailing application.

    Once the steel detailing is completed, the design team or contractor utilize the fabrication model for 4D modeling and clash detection with other building disciplines and models (MEP, architectural, etc.). The fabrication model contains more detail than the structural model, and consequently helpful for interference checking, particularly for building types or application where space is extremely tight.

    Applying the design model directly for fabrication will produce a usual feedback loop among fabricators and designers. It will convey fabrication considerations forward into the building design procedure. Sharing the design model with fabricators for bidding will curtail the bid cycle and initiate more consistent bids based on reliable steel tonnages. And the coordination among the fabricated steel and the other building components will decrease the on-site issues and lower the increasing cost of steel erection.

    An integrated BIM model empower fabricators to manage not only the fabrication phase of the project but also other verticals of the project as well as modeling, fabricated parts design and elaborating, contract management, financial evaluation, and supply chain management, along with keeping track of updated manufacturing data.

    Trim down project cost by removing any inaccuracies in the design of fabrication components, minimizing wastage and ensuring timely delivery of project.

    Benefits of BIM for steel fabrication :-

    Aid in generating off-site fabrication models for real time viewing in order that throughout the actual process of implementation designers, fabricators and architects in a similar way do not face delays.

    Allows clash-free design with consistent drawing sets

    Accurate Visualization during fabrication and erection

    Highly detailed models for making fabricated components

    Allows reviewing of automated construction documents and material lists
    High quality due to prefabrication of different components

    Reduction in wastage and improvement in schedule and delivery

    Useful links
    BIM and Digital fabrication

    Posted by Rajib Dey
    Business Development
    rajib@jobs2india.com
    Global Associates (Pioneer Company in 3D modeling with BIM & Sketchup)

    visit our BIM sites
    www.bimoutsourcing.com
    www.bimcoordination.com

    Saturday, October 29, 2011

    The impact of BIM for construction industry


    BIM or Building Information with it’s real time three dimensional features, serve as a construction productivity tool to increase productivity in the design and construction phases. Many large construction companies are experimenting with BIM to produce cost and schedule savings.

    BIM can be utilized for successful construction, lifecycle and long term facility management. BIM data is applied to demonstrate the entire building life cycle. Quantities and properties of materials are extracted without any difficulties. The scope of works is defined effortlessly. Moreover assemblies and sequences are presented in a comparative scale to each other and relative to the entire project.

    BIM contains geometry, spatial relationships, light analysis, geographic information, quantities and properties of building components.

    Building Information Modeling is digital representation of physical (actual parts and pieces being used in the construction process) and functional characteristics of a facility producing an allocated knowledge source of information about the facility. Thus BIM outline a trustworthy basis for decisions throughout its life cycle, from earliest conception to demolition.

    BIM can be utilized for construction visualization and result in considerable cost savings, from design and construction through to maintenance. BIM eliminates a lot of risk s and issues easier and earlier before actual construction took place. As a result the construction process gets shortened and construction takes places more efficiently


    BIM model saves time and waste on site as the model provides huge accurate and coordinated information which will lead to fewer errors on site. Thus BIM result in considerable cost savings, from design and construction through to maintenance.

    The reduced material waste and aptitude to optimize energy utilization through BIM has also made it a rising option for green building projects.

    With its parametric characteristics, BIM track the relations among numerous objects from early design through to completion so that if one object changes, the change is automatically coordinated across the project. Each change in design, scheduling or material is immediately accessible to every member of the building team—from engineering and purchasing to plumbing and electrical. As for example BIM analyzes and illustrates every member of the construction team how many light fixtures are required to light up a space receiving little sunlight. It works out how a change in wall color matches up against the carpeting that’s on order. BIM can also find out how a recommended change will have an effect on subcontractor costs and scheduling.

    The BIM can also be applied for MEP plans, to generate a drastic reduction in RFIs, and to optimize schedules.

    BIM has the potentiality to create a virtual information model that will be handed over from Design Team (architects, surveyors, consulting engineers, and others) to Contractor and Subcontractors and then to the Owner. Here every one will include their own additional discipline-specific knowledge and track changes to the single model. This can lead to reduction of information losses in transfer. BIM also facilitates conflict detection (where the model really notifies the team about parts of the building in conflict or clashing) to check errors occurred at the different phases of development/construction.


    BIM is also useful for evaluating several engineering factors like lighting, acoustics or energy practice, to facilitate provide feedback in the designing phase. So the engineers and designers get the ability to have the consequences of changes and discover alternatives in a streamlined process.

    BIM programs are also liable for creating general cost estimating for construction project. All the general information are extracted from the model and connects with a database for estimating.

    Now some new ideas like applying BIM for older, pre-existing facilities are coming up. These generally reference key indicators, like the Facility Condition Index (FCI). However, the legitimacy of these models should have been observed over time. In order to model an existing building it will require several assumptions about design building standards and codes, construction methods and materials available at the time of construction.


    Posted by Rajib Dey
    Business Development
    rajib@jobs2india.com
    Global Associates (Pioneer Company in 3D modeling with BIM & Sketchup)

    visit our BIM sites
    www.bimoutsourcing.com
    www.bimcoordination.com

    Thursday, October 27, 2011

    Validate your design with BIM based clash detection and constructability reviews


    BIM or Building Information Modeling plays an important role for design coordination, clash detection and conflict resolution.

    BIM selectively check for interactive clashes among any particular system, between MEP system and structural system etc. Clash checks are carried out at any level of detail (LOD) and across any number of building systems to resolve myriad probable construction dilemmas.

    Clash Detection facilitates well-organized inspection, identification and reporting of interfering clash in a 3D-4D BIM model involving different 3D-4D solid objects.

    The coordinated models may be utilized for quantity takeoff, locations, scheduling, and estimating.

    Advantages:
    • Diminish the risk of human error throughout model inspections
    • Resolve dilemmas at the design stage sooner than the construction phase when rework is enormously expensive
    • Produce a collaborative atmosphere amid all stakeholders performing in the direction of geting the best potential solutions to bottlenecks
    • Helps to reduce the risk of on-site error
    • The Coordinated models generate more precise quantities by location; do a comprehensive clash
    • The coordinated models cause more off-site prefabrication which can save hours of re-work in the field
    • The buildings are oriented and designed to achieve optimal energy efficiency

     

    Process

    Design/Construction Team must accomplish and manage an adequate and comprehensive Clash Detection practice to identify and resolve all major interferences among building components become the commencing of actual construction. If the building interference is found to be zero then it will result in minimizing the number of changes all through the construction.
    The BIM Manager will accumulate a compound model from all of the model parts of each design discipline for executing a visual check of the building design for spatial and system coordination. Vertical shafts are also evaluated to make sure that ample space has been arranged for all of the vertical mechanical systems and that all of the shafts line up floor to floor. BIM manager will issue a revised clash report to the technical discipline consultants before each scheduled coordination meeting.
    In case of a multistory project, the models are spilt on a level-by-level basis for MEPF coordination. For a large project the model is split by zones to trim down file size. Usually, 3D clash detection/coordination go on with a single floor awaiting for coordination of building systems and then continues on the next floor up.
    Coordination software may be applied for assembling a range of design models to electronically recognize, collectively coordinate resolutions, and track and circulate interference reports between all disciplines. The technical disciplines shall be responsible for updating their models to reflect the coordinated resolution.
    The team should analyze the model and the Clash Reports in coordination meetings on a usual as-needed basis during the design stages until all spatial and system coordination issues are resolved.
    All through the construction phase, the accurateness of fabrication models are verified. Before starting fabrication submittal for approval, fabrication contractors must put forward their models to the Contractor’s BIM Manager for integration and clash detection/coordination and resolution.
    Internal Clash Resolution – Design Consultants and Subcontractors required to coordinate the clashes among the various scope of work earlier than providing those models to the BIM Manager for spatial and system coordination.
    Spatial Coordination Verification: Verification and tracking of resolved conflicts of all trade coordination issues must be resolved before the starting of bidding as these may lead to change orders or field conflicts.
    Latest innovation in clash detection system is Tekla BIMsight. It is a free clash detection and coordination product.

    Useful links :-

    BIM clash detection

     

    Coordination and Clash Detection

    http://www.vicosoftware.com/coordination-and-clash-detection/tabid/88208/Default.aspx

     

    Minimum Requirements for Spatial Coordination and Clash Detection

    http://www.cfm.va.gov/til/bim/BIMGuide/applications.htm




    Posted by Rajib Dey
    Business Development
    rajib@jobs2india.com
    Global Associates (Pioneer Company in 3D modeling with BIM & Sketchup)

    visit our BIM sites
    www.bimoutsourcing.com
    www.bimcoordination.com

    Tuesday, February 22, 2011

    BIM (Building Information Modeling) Products

    Design and Documentation

    Revit Architecture
    This software was formerly termed as Revit building. The software is ideal for architects and building designers to analyse design concept early in the architectural engineering process from conceptual design to construction drawings and design. It is purpose build for building information modeling as 3D building objects are saved in .RFA files and imported into the RVT database as .RVT files for hoarding BIM models.

    Download free trial
    http://usa.autodesk.com/adsk/servlet/download/item?siteID=123112&id=13133636

    Revit Structure
    Revit® Structure software provides physical and analytical structural modeling and facilitates integrated structural analysis & design from engineering to documentation.

    Revit structure provides multidisciplinary coordination and reduces costly redlining to detect errors prior they show up in the field. This leads to higher profit margins.

    Download free trial
    http://usa.autodesk.com/adsk/servlet/download/item?siteID=123112&id=13134276

    Revit MEP
    Revit® MEP software generates building information modeling (BIM) and construction document solution for mechanical, electrical, and plumbing (MEP) engineers. The software analyze, optimize and visualize building systems alongwith Duct and Pipe System Modeling. With the parametric change management technology Revit MEP modify, update model views and sheets to keep the document and project consistent within Revit-based workflows.

    With the features like in-built analysis capabilities and interoperability the software provides better decision making and building performance analysis support for the engineer. Thus the software creates and environmentally conscious designs.
    Revit MEP contains heating and cooling loads analysis tools to execute energy analysis, evaluate system loads, and produce heating and cooling load reports for a project.

    Download free trial
    http://usa.autodesk.com/adsk/servlet/download/item?siteID=123112&id=13133752

    AutoCAD Civil 3D
    AutoCAD® Civil 3D® software provides great advantages for Civil engineers as the software applies building Information Modeling (BIM) to create transportation, land development, and environmental projects digitally before the commencement of actual construction.

    By applying this software the civil engineers can complete the transportation, land development, and environmental projects quickly and more efficiently.

    Civil 3D models can be applied for stromwater & geospatial analysis to generate more sustainable designs. The software can also be applied for street and highway design modeling, dynamic earthwork calculation and quantity takeoff.

    Download free trial
    http://usa.autodesk.com/adsk/servlet/download/item?siteID=123112&id=15019446

    AutoCAD
    It is one of the leading 2D and 3D CAD tools that contain thousands of available add-ons for 3D CAD design, drafting, modeling, architectural, construction & engineering drawing.

    The inbuilt Parametric Drawing Tools generate both geometric and dimensional constraints to make sure that specific relationships and measurements stay persistent even as the objects are modified.

    With this software the engineers can draw anything in 2D and afterwards add a height to every object to get a 3D object instantly.

    AutoCAD lets the user to wipe out and get a clean sheet with every modification that is requested or allowed. This leads to produce methodically clean and professional drawings.

    There is lots of version ranging from AutoCAD 2010, 2009, 2008, 2007, 2006, 2005, 2004, 2002, 2000 R14 & AutoCAD LT.

    Download free trial
    http://usa.autodesk.com/adsk/servlet/download/item?siteID=123112&id=13779351

    AutoCAD LT

    AutoCAD LT can be termed as AutoCAD’s lower-cost 2D drafting sibling. It is the top-selling 2D drafting and detailing product that contains industry standard 2D drawing tools.

    Though AutoCAD LT is built for 2D drafting but it can display 3D models created in AutoCAD.

    Creating in the genuine DWGTM file format provides stability and compatibility and boost the productivity.

    Download free trial
    http://usa.autodesk.com/adsk/servlet/download/item?id=13706332&siteID=123112&nd=1

    Posted by Rajib Dey
    Business Development
    rajib@jobs2india.com
    The 3D modeling Service