adsense analytic

Showing posts with label BIM modeling. Show all posts
Showing posts with label BIM modeling. Show all posts

Wednesday, April 3, 2019

A position is vacant for Revit Designer in Los Angeles

JSFA, an award winning firm that deals with programming & design of new restored and renovated Educational/arts/entertainment/facilities, is inviting applications for a Revit Designer/Revit Architect for their Los Angeles office.

The candidate has to perform project BIM modeling from start to finish as well as organize the design and technical detailing via BIM modeling and Revit rendering.

Background and Experience:

• Possess Bachelor degree of Architecture required;
• At least 3 year experience with Revit 3D modeling required;
• Experience with construction documents will be added advantage;
• Experience with construction administration will be added advantage;
• Prior 

Educational/Arts/Auditoriums/Theater/entertainment facilities design experience preferred;

• At least 3 year working experience in architecture design firms;
• Sound knowledge in AutoCAD.

Other:

• Local candidates, full time only;
• Competitive salary with great benefits;

To apply for the post, send your resume work samples to hr-la@jsfarchs.com and email subject line as Revit Designer.


A position is vacant for Revit Designer in Los Angeles

Read Continue
~~~~~~~~~~~~~~~~~~~~~~~~~~
Published By
Rajib Dey
www.bimoutsourcing.com
~~~~~~~~~~~~~~~~~~~~~~~~~~

Saturday, May 5, 2018

GRAPHISOFT launched ARCHICAD 22 for BIM

GRAPHISOFT has introduced ARCHICAD 22, the newest version of its award-winning BIM software solution. With ARCHICAD 22, the architectural design and documentation workflow for building façades has been improved significantly. Besides, crucial enhancements are made to ARCHICAD 22 concerning construction modeling, information management and 2D performance.

The Curtain Wall tool of ARCHICAD 22 is significantly refurbished to transform the designing process of building façades a perfect graphical experience for architects with its modular pattern editor.

The new Façade Design workflow contains the whole design workflow from concept through design development to documentation supporting local standards fully supported with BIM.”
New features of ARCHICAD 22: The renovated Façade Design workflow offers a adjustable design environment for architects to produce external or internal façades with modular structures and hierarchical, simply modifiable patterns. ARCHICAD-Grasshopper Connection is also significantly improved and it supports both conventional and algorithmic workflows.
The improved Profile Editor simplifies the process for generating intelligent profiles for columns, beams and walls and manage the shapes and sizes of their cross sections through BIM parameters.
The brand-new Expression Defined Properties significantly enhance the power of ARCHICAD to control the “I” in BIM. GRAPHISOFT’s patent pending Machine Learning (ML) algorithm modifies 2D navigation to each project’s content and leads to a very smooth and responsive navigation.

ARCHICAD 22 also comprises of Maxon’s latest (R19) CineRender engine that produces stereoscopic or 360° spherical renderings; a superior Teamwork experience because of rapid element reservation; and greater quality and accuracy while exporting building component information from composite skins and complex profiles – with OPEN BIM standards.
ARCHICAD 22 also offers various othr performance and functional enhancements. To get more information, please visit www.graphisoft.com/archicad


~~~~~~~~~~~~~~~~~~~~~~~~
Published By
Rajib Dey
www.bimoutsourcing.com
~~~~~~~~~~~~~~~~~~~~~~~~

Saturday, August 5, 2017

BIM/Revit Newsletter | August 2017 Newsletter

What is LISP? LISP is a known computer programming language with a long history and an original, fully parenthesized prefix notion.
Autodesk Revit or Revit is a BIM modeling software for the architects, structural engineers, MEP engineers, designers and contractors that are developed by Autodesk.

Revit is industry leading software application which helps BIM in designing and creating the construction of commercial buildings.
This course and tutorials are designed in order to teach the users in detail about creating the clash detections, reporting them...

BIM methodology is increasingly improving their works in the building design. It is also leading us towards an inevitable increase...
The Axioms/fundamental of BIM: Sometimes BIM processes and procedures can be complicated and some of the standards are being pushed.

A few key steps in the Collaborative BIM procurement for the clients and the Central premise say that they can start it from the end.


Keep Reading,
From team of bimoutsourcing.com
Thank You
www.bimoutsourcing.com



~~~~~~~~~~~~~~~~~~~~~~~~
Published By
Rajib Dey
www.bimoutsourcing.com
~~~~~~~~~~~~~~~~~~~~~~~~

Monday, May 22, 2017

Rand Worldwide’s IMAGINiT Technologies Division Introduced IMAGINiT Clarity 2018 For Revit And BIM Users

Rand Worldwide’s IMAGINiT Technologies division has recently launched IMAGINiT Clarity 2018. This newest version supports 2018 and earlier versions of Autodesk Revit as well as facilitates the users to supervise, access and employ the most valuable data accumulated in Revit software models. IMAGINiT Clarity 2018 enhances the productivity and capability of the whole BIM team by extending the entry to the data obtainable in the building information model (BIM).
IMAGINiT Clarity 2018 is developed to supervise the health of the model and make secure collaboration better by performing proactive model management.
There are nearly 60 metrics available via a single, customizable dashboard, Clarity facilitates building information coordinators, administrators and members of the expanded team to systematically monitor the health of the model. This increased perceptibility will help in minimizing the risk of the model seemly corrupt, reducing errors and positively impacting the effectivenent of the team. The dashboard can be personalized to find out particular metrics and data can be compared on various projects to accelerate the decision making throughout the organization.
IMAGINiT Clarity 2018 offers the following exclusive features :
• With Revit Warnings, the users will be able to monitor the complete health of the model over multiple projects on one dashboard. BIM Coordinators get the ability to recognize the intensity of warnings and obtain email alerts in order that they are assessed within specific time.
• Content Metrics inspects all Revit content out of your content libraries and separate models, and evaluates both the quality with regard to file size, complexity and best practices along with the usage of the content.

• It has incorporated with Dropbox, BOX, Autodesk A360 and BIM360 Docs that facilitates automatic delivery of PDFs, AutoCAD DWG and other project files to online locations. Thus the firms can distribute information smoothly with consultants and partners via their preferred medium.
• Model Change Notification creates comparisons among succeeding versions of Revit models. Specifically suited for dealing with Revit models obtained from partners as this can send alerts regarding unpredicted changes.
• Clarity Viewer offers users with a free and protected 3D view of the model devoid of exiting the Clarity environment or shifting their models to the cloud.

For more information, visit www.imaginit.com


~~~~~~~~~~~~~~~~~~~~~~~~
Published By
Rajib Dey
www.bimoutsourcing.com
~~~~~~~~~~~~~~~~~~~~~~~~

Friday, May 19, 2017

Heritage BIM Is Ideal For Documentation And Development Of Historical Structures

The application of Building information modeling (BIM) becomes more versatile when it offers huge benefits in the documentation and development of historical structures in a system known as historical BIM (HBIM). The process is complicated for transforming point clouds into a 3D model as there are lots of asymmetrical geometries in the concerned buildings. So, various semi-automatic parameterization tools are required.

Historical building information modeling (HBIM) stands for a semantic-aware database of historical buildings, through which the geometric model is associated with explanatory multi-source information. Historical buildings generally comprise of stratified artifacts along with non-regular and complicated geometry, contrasting to present constructions which normally contain regular geometry. Reality-based spatial data that is generated from cutting-edge geomatics 3D modelling methods can deliver a perfect replica of those buildings, containing all the related information, even though the diversified characterizing shapes are a big challenge at the time of modeling the geometry. Often these shapes are remodeled by hand, as there are limitations for impressive automatic recognition. The aims, structure and scale – and consequently the projected level of detail of the model – significantly impact the system to data acquisition (sensors, accuracy) and data processing.

The workflow for HBIM projects commence from data procurement from different sensors in relation to the necessity of context and the projected outputs. Then, the surveyed point clouds should have been pre-processed and curtailed with different systems and standalone software, and possibly modified for segmentation by means of automatic or semi-automatic object recognition into a BIM platform. Besides, elements are modeled and transformed into an approximation of reality in line with parametric rules, so it is likely to adjust each illustration of the model. As a final point, the shapes and the identities of objects should be associated with proper and sound relationships in accordance with the semantic definition of entities. After this, the model is ready to be explored with other information for analysis and monitoring over time. On the other hand, the manual creation of 3D models linked to as-built BIM is complicated and laborious. As the costs and skills necessary for manipulating the data signify that this approach is not justifiable and more automatic or semi-automatic tools for parameterization of metric and non-metric information are essential.

BIM platforms come up with some standalone embedded tools or plug-ins toward 3D modellers, viewers, analysers. They facilitate the best use of point cloud and processing with the intension of generating geometric modelling, feature extraction and parameterization in heritage buildings. Some commercial ones comprise of ArchiCad BIMx by Graphisoft, Scan-to-BIM by IMAGINiT, Revit by Autodesk, BIM360 by Autodesk, Recap by Autodesk, PonitSense by FARO, Leica CloudWorx, Green Spider, Bentley MicroStation V8i and Tekla Structures. Some open-source alternatives are Edificius, Tekla BIMsight and Autodesk Navisworks Freedom by IMAGINiT.


To read the complete article, go through the following link gim-international.com

Heritage BIM is ideal for documentation and development of historical structures

~~~~~~~~~~~~~~~~~~~~~~~~
Published By
Rajib Dey
www.bimoutsourcing.com
~~~~~~~~~~~~~~~~~~~~~~~~

Future Construction Project Should Rely On 3 P’s Of BIM (People, Process & Policies)

To reap the complete benefits of BIM for next generation of construction, the emphasis should be given on the 3 ‘Ps’ of BIM i.e. people, process and policies.
People is the first ‘P’ of BIM: To implement BIM in a positive manner, the organization should need the entire team to realize its significance and accept it’s adaptability. The people are mostly responsible to bring in the advancement and so it should be given first priority against the processes and policies.
It is very crucial to develop sound relationships with professionals, in-house teams or a design support solutions provider. It is considered as one of the most vital factors while commencing technological conversion.
Process is the second ‘P’ of BIM: Sometimes, it is found that even skilled AEC professionals find it difficult to execute BIM though they are fully conscious concerning the benefits of the BIM. They mostly prefer to adopt the shortest and simplest method by employing the new technology with old processes. They give priority to use the obsolete processes because they are accustomed and comfortable with them.
As for instance, it is found that professionals or AEC firms using a building program in Microsoft Excel on one monitor, and although, they require Autodesk AutoCAD or Revit. They are engaged in generating and regenerating the data while they can employ Excel-to-Revit tools and produce spaces from Excel in Revit automatically. Lots of processes produce a lot of data waste over the lifespan of construction projects.
The third ‘P’ of BIM is policies: While going to adopt BIM-friendly processes, company policies are considered as the major barrier to overcome.
BIM becomes effective when all the people, who are associated with the construction project, can distribute information without restrictions as well as collaborate. Contracts generally prohibit information distribution by adhering to the clause of confidentiality, liability and litigation concerns. So, it is vital to understand that design solutions are essential to the protect companies as well as inspire them to collaborate.
Companies can also safeguard themselves with the use of filters to the information they distribute; as for instance, building plans should be marked with green, yellow, or red, to specify whether the information is final, provisional, or incomplete. By making collaboration with stakeholders, all parties can mutually settle definitions, processes, policies, and parameters before the commencement of any project. This initiative can minimize risk and at the same time reorganize the workflows that BIM depends upon.

Article Source : www.pbctoday.co.uk
Future construction project should rely on 3 P’s of BIM

~~~~~~~~~~~~~~~~~~~~~~~~
Published By
Rajib Dey
www.bimoutsourcing.com
~~~~~~~~~~~~~~~~~~~~~~~~

Tuesday, March 29, 2016

How BIM coordination process helps in completing the Oculus World Trade Center Transportation Hub successfully

This BIM video provides an exclusive demonstration on How BIM was utilized to simplify the design progression concerning the Oculus World Trade Center Transportation Hub in New York for the Port Authority of New York and New Jerse. The project was executed by Skanska, the most recognized construction groups in USA.

To make the coordination process better amid design and construction, the project team employed Building Information Modeling (BIM) technologies of coordination. To initiate BIM modeling process, it costs $40,000. But the project cost was significantly decreased as the additional coordination has resolved various clashes on the jobsite at the initial phase before the construction is developed in reality. With the use of wide-ranging planning and coordination activities, the construction team get the ability to complete the project successfully in scheduled time.


~~~~~~~~~~~~~~~~~~~~~~
Published By
Rajib Dey
~~~~~~~~~~~~~~~~~~~~~~

Thursday, November 12, 2015

BIM IN A PROJECT MANAGEMENT: WITH REVIT 2016 | ECOTECT ANALYSIS | LUMION 5.0 SOFTWARE (BIM - Building Information Modeling) for BIM professionals – An exclusive e-book on BIM

Alberto Bella has published an exclusive e-book alias BIM IN A PROJECT MANAGEMENT: WITH REVIT 2016 | ECOTECT ANALYSIS | LUMION 5.0 SOFTWARE (BIM - Building Information Modeling) for BIM professionals”. A kindle version is available just for Rupees 65.

The book explains the theory to portray and determine the practices related to BIM (building information modeling) that could frame a new standard for dealing with the construction process efficiently. This step is already undertaken to a wide section of the more developed countries.

In order to resolve the issues presently occurring with Construction sectors, BIM stands as one of the "elements of innovation" the proper implementation of BIM is very much needed. BIM can act as the powerful functional tool with a new and superior logic process management system , projects and products, that can significantly make the best use of time and costs.

The book presents the topic with an explanation of historical data, the main definitions and practice of work. After making a thorough research on the power of BIM, reference is made to its global presence by determining how BIM is accepted by several countries in their legislation and / or national regulations. The true validation of interoperability and BIM modeling, study of the energy requirements of heating or cooling in theory to suit our object of study, up to its illustration in graphics rendering.


BIM IN A PROJECT MANAGEMENT: WITH REVIT 2016

~~~~~~~~~~~~~~~~~~~~~~
Published By
Rajib Dey
~~~~~~~~~~~~~~~~~~~~~~

Friday, August 7, 2015

Want to complete your Residential and Commercial Building Projects Quickly: BIM will Helps You.

Now Technology is everywhere and brings comfort to human beings and takes an important part to our daily life. It also takes an important part in the field of architecture, engineering and construction (AEC) Industries. 

Building information modelling (BIM) is a process by which the AEC industries professionals are completing their projects in a short time. The experts are now using correct and upgraded technology (Tools) for construction across the world.

Mechanical, electrical and plumbing (MEP) is one of the part of BIM process. MEP relates to Air handling units, Water pumps, Drainage Pumps, Fire fighting equipments etc. installing and design. The models of buildings are totally digitalized and made through Revit models. The model is used for clash tests and building construction professionals resolve the clashes by required changes to the design. And when the problem resolved the design, quality of the building reach to a bench mark.

So if the BIM process is follows properly and proper information provide to AEC experts, construction projects can be completed very fast with supreme quality.

Now Technology is everywhere and brings comfort to human beings and takes an important part to our daily life.
Image Source : bradleybim.com

~~~~~~~~~~~~~~~~~~
Published By
Rajib Dey
~~~~~~~~~~~~~~~~~~

Wednesday, March 25, 2015

Create more precise design & documentation with AutoCAD 2016

Create more precise design & documentation with AutoCAD 2016
Autodesk has just introduced AutoCAD 2016, the most updated & improved version of its globally recognized Computer Aided Design (CAD) programs.


Lots of advanced and striking features are included in AutoCAD 2016 which definitely speed up the 2D and 3D design, documentation & collaboration method and at the same time make the on-screen experience better by generating almost any figure.

The users can get help through TrustedDWG™ technology to preserve and distribute design data as well as work securely with others.

The detailing and documentation work will be significantly accelerated. The remarkable visual advancement will add a unique level of visibility and intensity to each aspect of a design. The productivity is also greatly increased through improved PDF output and closer integration with Building Information Modeling (BIM).

With the enhancements in dimensioning & text editing, the complete drawing section will be improved and the users get the ability to work efficiently and rapidly as well as get a preview of their activities in real time.

Enhancements to the drawing area in AutoCAD 2016 significantly get better visual exactness visible on screen. Improved readability and detail will substitute uneven line segments with smooth curves and arcs. The users can apply the most sophisticated graphics hardware to present a greater and faster visual experience. The users can get rid of “undo” a command through extended Command Preview.

AutoCAD 2016 comes up with improved PDFs which are smaller in sizes and keeps up visual accuracy. PDFs are now completely searchable, all hyperlinks are preserved & attached to drawings.

Enhanced smart dimensioning automate the process for producing perfect measurements on the basis of chosen object type that facilitates the users to create measurements precisely based on the drawing context.

Availability: There exist various purchase options and the users can opt for a perpetual license with or without Maintenance Subscription, or a Desktop Subscription with pay-as-you-go monthly, quarterly, and annual options. With desktop subscription, the users can avail the latest updates and releases, one-on-one technical support, and priority support in the forums.



Go through the following exclusive video tutorial to get familiar with various new and advanced features of AutoCAD 2016.


Tekla Structures 21 is very useful for industrial & commercial construction project workflows

~~~~~~~~~~~~~~~~~~
Published by
Rajib Dey
~~~~~~~~~~~~~~~~~~

Tuesday, January 20, 2015

European BIM Summit 2015

Association of Quantity Surveyors, Technical Architects and Building Engineers of Barcelona-CAATEEB), together with the BIM Academy, is organizing a exclusive seminar on Building Information Modeling in Barcelona, Spain commencing from February 2015 on 12th and 13th.

The BIM conference will comprise of complete sessions of talks, practicums, visits, new services and new companies all featured on BIM, as well as 3 top-level speakers each session, standard case studies and workshops about applications (contractors, software…).The presentations are available in English and Spanish with instantaneous translation facility.

The motto of this seminar is to organize attendees from each European country in all the sectors associated with the building life cycle which range from BIM software and product industry, manufacturers and producers as well as associations, managers, consultants, professionals.

Schedules of the seminar:- Day 1 - February 12, 2015


Saturday, January 3, 2015

How Virtual Modeling Process can make the facilities management system superior

Building information modeling (BIM) is considered as the part and parcel for efficient construction design. But we always neglect the fact that how we can utilize the BIM data in future to enhance the complete lifecycle of the building rather than construction.

So we should maintain good practice to preserve the post-construction model data. In order to get long-term benefits from BIM, the facilities management process should be improved to a great extent. Given below, some useful tips on virtual modeling that can enhance facilities management practice.

1. Superior space management: Facility professionals should have clear & concise ideas regarding usage of the space to condense vacancy and in due course get significant cutbacks in real estate expenses. Gather room and area information within a BIM models for superior space management. It will also help in collecting data and any reformation work.

2. Optimize maintenance: Put the product and asset information into the database for undertaking efficient maintenance programs as well as precautionary maintenance. Preserve this data within BIM models and downloading it into the facility management system to manage maintenance systems perfectly and at the same offer superior performance. BIM facilitates a maintenance engineer to obtain maintenance information by clicking on the object in the model. Besides, the maintenance engineer can know in advance if any maintenance is necessary by receiving an alert.

3. Superior Energy Utilization: BIM makes the maintenance procedure to maintain the equipment precisely to the best possible environmental conditions. The facilities professionals can get rid of the waste related to escalating operating costs for facilities which are functioning poorly.

4. Cost-effective retrofits and restorations: The cost and complication associated with renovation and retrofit projects is reduced to a great extent by acquiring better information concerning existing conditions. Besides, the valuable mistakes can be circumvented which are associated with alterations that don’t adhere to code requirements can be circumvented.

5. Enhanced lifecycle management: The owner can understand the advantages of spending money in materials and systems which may be expensive in initial stage but provide a good reimbursement over the lifecycle of the building. By gathering data from a BIM model, the depreciation of the assets can be estimated to fully make out financial and tax benefits.

Conclusion: With advancement of BIM technology, the design and construction firms should evaluate the full potentiality for the building’s lifecycle.

Skanska develops BIM protocol plan for George Washington University which will formulate the new standards and approaches in facilities management. It will be applied in future university design and construction contracts by addressing the elements like how the model is arranged and how that model is distributed amid architects and construction managers as well as how an incorporated model is delivered in future.

How Virtual  Modeling Process can make the facilities management system superior

Image Courtesy: www.vianovasystems.no

Ref.: http://blog.usa.skanska.com

~~~~~~~~~~~~~~~~~~~
Published By
Rajib Dey
~~~~~~~~~~~~~~~~~~~

Tuesday, December 9, 2014

How BIM was applied in the most complicated project of Walt Disney alias Enchanted Storybook Castle for the Disney Shanghai Resort

Enchanted Storybook Castle for the Disney Shanghai Resort is the largest of Disney’s castles which was successfully designed in 3D with the help of various Building Information Modeling (BIM) programs & processes.

Due to the incorporated workflow and ground-breaking BIM technology, the project was awarded with a 2014 AIA TAP (Technology in Architectural Practice) Award for Delivery Process Innovation. The project is expected to be opened in 2015.

Various design approaches were applied with the project as it contained a modern & complex interior, along with a central double-helical staircase, restaurant, fountain pumps, a boat-ride system and its maintenance facility, a children’s salon and lots other. BIM was utilized for 3d modeling & coordination of all of the design disciplines associated with the project.

The design took help of the cloud collaboration that facilitates distribution of models smoothly, fewer revisions for communications and superior detail.

BIM-supported collaboration through web-based social, video-telepresence, and cloud-based computing also harmonized various project team members to construction jobsites facilitating efficient delivery of major project milestones.

The architectural team applied Revit software but the Structural and MEPdisciplines inside the team preferred to go with AutoCAD. In order to switch over data amid various disciplines, the team also developed an in-house workflow. The design files provided a output of architectural Revit information each day for the other disciplines through various custom scripts.

To create the design of the project simultaneously, near about 142 disciplines which involve architects, engineers, and sub-contractors worked together from diverse locations of the globe.

In order to circulate the information across the team members belonged to two sides (Glendale and in Shanghai) of the globe , a BIM information diagram was created to get the view who was liable for what and how their information was transmitted across the globe.

To cope with the problems for limited internet connectivity in China, the team applied a cloud-supported construction collaboration platform alias Buzzsaw to convey updates to the BIM model back and forth connecting Glendale and Shanghai.

The design team focused on the architectural detail after setting up the model precisely as well as making proper communication on both sides of the world. A BIM “surge team” helped in producing intelligent, parametric content inside the model. The details encompassed mock terrain & architectural ornamentation for a period-correct medieval castle comprised with windows, doors, complicated roof structures, turrets for the towers, and the double-helix central staircase. All of these details were saved as Revit Objects in a central library for later usages in various diverse places in the castle.

The project team had set up standard naming conventions to list numerous BIM objects like cornices and antique windows generated in-house. All that architectural ornamentation resulted in superior quantity extraction and construction management.

Attributes allocated to geometry facilitated WDI’s architects and engineers to envisage a material breakdown concerning the building, which facilitated creating the design, coordination, and operations decisions for having the proper amounts regarding concrete and other materials for the two fireworks-launching platforms on the building. Attributes were then assigned into the objects to know how the materials combated jointly to resist flame-spread.

The coordinated 3D model facilitated the teams to design a perfectly incorporated building. Design was completed in perfect time, construction on the castle started last year.

BIM was applied in the most complicated project of Walt Disney

Image Courtesy : lineshapespace.com


~~~~~~~~~~~~~~~~~~~
Published By
Rajib Dey
~~~~~~~~~~~~~~~~~~~

Wednesday, November 19, 2014

The role of advanced technologies in Design and Construction Industry

Steve Jones, Senior Director of McGraw Hill Construction has presented an exclusive video for BIM professionals. In this video, the BIM professionals will be familiar with some sophisticated technologies & procedures ranging from building information modeling (BIM), laser scanning, augmented reality, rapid virtual prototyping, and jobsite automation integrated with ground-breaking practices such as virtual coordination, digital fabrication and lean construction, and how these technologies provide great impact to construction sectors by minimizing waste & enhancing outcomes.

Steve also provides his viewpoint toward the functionality of specialty trade contractor in the growing ecosystem of project delivery specially giving importance on MEP firms.



~~~~~~~~~~~~~~~~~~~
Published By
rajib Dey
~~~~~~~~~~~~~~~~~~~

Thursday, September 18, 2014

Autodesk has tied up with Japan based Nihon Sekkei to offer top-notch BIM practices

Autodesk, Inc has tied a knot with Japan based Nihon Sekkei, with the air of providing the top-notch Building Information Modeling (BIM) process catering to the Japanese market. The two companies will jointly develop BIM workflows useful for Japan based BIM professional to cope up with the global building design requisites which can help in constructing smart, energy efficient buildings and infrastructure.

Nihon Sekkei is a renowned architectural design firm that has been delivering substantial architecture projects like universities, hospitals, hotels, offices and financial centers since 1967. Some of their remarkable projects range from Toyota Motors’ Nisshin Education and Training Center, IBM Japan’s Makuhari Office, Tianjin International Financial Center, Shanghai International Trade Center, and Kanazawa Medical University Hospital.

The two companies will co-actively get the most out of the advantages of BIM to offer more value to owners, users and society during the whole building lifecycle.

The benefits of this strategic alliance will provide the following:-

Nihon Sekkei will apply Autodesk Revit software’s incorporated model data in favor of architectural, structural and MEP design to facilitate designers and owners to measure as well as make the environment effect less complex over the buildings. It will be useful for creating sustainable environment.

Both will utilize Autodesk Revit and cloud services like A360 platform to build up new design workflows.

Develop data interoperability amid Autodesk platforms as well as various specialized third-party applications like facility management and simulation so as to widespread Nihon Sekkei’s technical consulting and design services abilities. The motto is to provide support for superior planning and decision making all through the building phase.

In order to interchange ideas and experiences with global industry leaders to flourish BIM as the global standard, both will work mutually.

These activities will be very fruitful for both the companies to expand the significance of incorporated BIM that can transform the various design practices and workflows to the next level. Besides, both the companies will uphold the imposition of standards or regulations concerning architectural guidelines and level of development (LOD), and team up with companies in the construction industry, education and research institutes, and government agencies to convey practical benefits from next-generation BIM.

Autodesk has tied up with Japan based Nihon Sekkei to offer top-notch BIM practices

~~~~~~~~~~~~~~~~~~~
Published By
Rajib Dey
~~~~~~~~~~~~~~~~~~~