adsense analytic

Showing posts with label BIM architecture. Show all posts
Showing posts with label BIM architecture. Show all posts

Tuesday, March 26, 2019

A position is vacant for a BIM manager

Job Description: Handel Architects is inviting application for a devoted and energetic BIM Manager to lead and manage the firm’s projects efficiently around the world.

The candidate has to perform inside a highly collaborative environment, with senior staff, on an extensive range of large and impactful urban projects, and involve as mentor and technical guide to all project teams.

The candidate will be liable for sustaining and advancing the existing BIM processes, content and standards supporting company’s daily practice, and make sure that the teams are satisfying these needs over the project life cycle.

Requirements:

• At least ten years of experience in Architectural practice on project teams at all stages of project development.
• Take part in the full cycle of three or more large scale built projects, involving collaboration with all most important disciplines, and in an important BIM capacity.
• Sound knowledge in Revit, visual programming and related third party capabilities.
• Well versed with performance analysis tools and process employed to BIM for energy consumption, solar study, view and quality control.

• Expertise with Rhino and visual programming, visualization process and their interoperability with other environments.
• Knowledge with developing and supporting an office wide infrastructure of: technologies, processes, workflows, employee training, policies and quality controls methods for BIM work on several projects.
• A discipline to govern all BIM related project team inquiries, and actively involved in sustaining a view of project requirements and current project alignment with established office wide practice.
• Dedication for better productiveness through process refinement and progress of automation. Adeptness with the related programming languages and knowledge of the APIs is an added advantage.

• Sound knowledge in oral, written and graphic communication necessary for engaging and efficient teaching, and an aspiration to help others improving their skills in these areas.
• Well-built self-directed motivation and judgment to arrange priorities and manage competing demands for achieving long range goals.
Besides salary, there are other benefits like health benefits, competitive PTO, parental leave, 401K match, reimbursement and mentoring for ARE exams, and Whiteboard Groups.
Please, send your application by clicking on this link andelarchitects.com
A position is vacant for a BIM manager
~~~~~~~~~~~~~~~~~~~~~~~~
Published By
Rajib Dey
www.bimoutsourcing.com
~~~~~~~~~~~~~~~~~~~~~~~~

Monday, December 24, 2018

Different types of risks with BIM (Building Information Modeling)

Building information modeling (BIM) software is a tool that can be used to minimize the cost of construction as well as accelerate the construction process of any project.

BIM software can decompose components of the job and help to obtain a superior understanding of the construction project that is executed by the contractors and subcontractors. If employed perfectly, BIM can minimize construction time, costs, and claims.

The problems may occur when BIM is not precisely shared and demonstrated to all construction members.

Communication: While enforcing BIM as an inherent part of your project, the problem may arise if proper collaboration is not made among everyone associated all through the construction phases. With BIM, the architects can produce a superior building model that minimizes costs and materials, if the general contractor (GC) is not involved on the plan, then claims and issues will take place.

Control: As soon as the BIM is formed and allocated to the project members, proper protection should be taken to minimize the scope for consequent modifications by unauthorized parties. The process is complicated to modify a BIM model on large construction projects where various consultants and contractors give effort to complete modifications to reap their own advantage devoid of distributing the ideas to the whole group. Hence, a team leader should be appointed and performed as the only authorized user to rectify the BIM model.

Design Errors: Who will be responsible when the building collapses to abide by the most updated construction codes? There exist a thin line among liabilities as each party taking part in planning phases, corrections and input to the BIM model. In several cases, legal issues are stimulated by claims demonstrated by the GC, because of misinterpretation or inappropriate designs. Due to these types of errors, extra legal fees may incur which were not taken into consideration in the original contract, minimizing the savings formed with the BIM process.

Construction Costs: When BIM is employed on construction projects, it provides an idea of the total anticipated construction costs without showing the real cost. BIM facilitates you to work out the most precise building cost-to-complete, but it will not take into account actual price deviation from developing market like metals and petroleum-derivative products, politically-vulnerable commodities like oil, and uncontrollable events like natural disasters.

Minimizing Errors - The following tips are important for eliminating some errors and risks common to using BIM:

• The BIM team leader should be a tech-savy.

• BIM group members should have the capacity to communicate their ideas smoothly.

• Liabilities should be allotted evidently. Each team member should be well versed with their role and drawbacks.

• Make sure your contractors can build with BIM.

• Consult with your insurance agent regarding all relevant issues that can develop from malpractice issues and under-performing relevant issues.

• Apply clear and specific contracts that can recognize all potential risks and their liabilities.

Next Steps: BIM is applied with the Integrated Project Delivery system to curtail claims and possible issues. Some key specific legal clauses can also be integrated into the construction and design contracts. As with BIM, better communication among team members is the most vital factor to get success while employing BIM-IPD in your construction project.

Read more

Different types of risks with BIM (Building Information Modeling)

~~~~~~~~~~~~~~~~~~~~~~~~
Published By
Rajib Dey
www.bimoutsourcing.com
~~~~~~~~~~~~~~~~~~~~~~~~

Friday, December 7, 2018

The role of BIM and FM in existing building

The latest digital tools are applied to perfectly capture wide-ranging 3D point cloud data as well as record the built environment with amazing detail and perfectness, irrespective of the nature or use of the building.

The objective of point clouds and high resolution, high dynamic ranging imagery data sets is to support drafting and modelling tasks, an office supported method that facilitates the formation of dependable and genuine digital copies of reality.


In due course, these intelligent, parametric models framework the optimum way for distributing the project and asset information, substituting the conventional 2D computer aided design drawings.

Besides, the BIM output is customized to make it suitable for the owners and operators: populating BIM objects with asset information whereas connecting these objects with Facilities Management software, facilitates the application of the model throughout the operation of the facility and getting advantage from inclusive 3D spatial illustrations of the assets.

In reality, surveying and modeling as built structures and assets can put challenges: a common barrier is the scarcity of comprehensive asset registries. All through as-built surveys the asset should recognized and coordinated with the survey data set; a prospective method is to label prevailing assets with unique ID’s or employ RFID’s to recognize each pertinent object, as a consequence rendering them assignable inside the survey data set.

Predefined attributes allotted to parts or components in a BIM package can be expanded to adapt specific requirements like part numbers, model or product codes can be added in shared parameters that extend the predefined inventory. In the same way, elements like installation date or warranty expiry date, pertinent for operation and management, can be included with the BIM.

The movement of data among BIM and FM software is more and more streamlined with the use of the COBie (Construction Operations Building Information Exchange) data format. This non-proprietary format set ups a standard for the publication and delivery of asset data and is compatible with the more suitable BIM and FM packages. By generating scripts to automate the flow of data among different tools is the most recognized method of systematically updating and retaining the models and asset registries devoid of manual data entry.

Implementing BIM is a process to consolidate digital information, removing redundancy and thus arranging more and accurate data for FM tasks. It makes sure that the models accessible online will provide lots of advantages to maintenance works. As a result, the service engineer can apparently trace the components for maintenance purpose and verify the work order as soon as the item is recognized. Upon completion of the servicing work, the same technician can populate the appropriate object parameters, thus computerizing the system of updating the central model and FM database.
Article Source: www.bimireland.ie











~~~~~~~~~~~~~~~~~~~~~~~~
Published By
Rajib Dey
www.bimoutsourcing.com
~~~~~~~~~~~~~~~~~~~~~~~~

Saturday, May 5, 2018

GRAPHISOFT launched ARCHICAD 22 for BIM

GRAPHISOFT has introduced ARCHICAD 22, the newest version of its award-winning BIM software solution. With ARCHICAD 22, the architectural design and documentation workflow for building façades has been improved significantly. Besides, crucial enhancements are made to ARCHICAD 22 concerning construction modeling, information management and 2D performance.

The Curtain Wall tool of ARCHICAD 22 is significantly refurbished to transform the designing process of building façades a perfect graphical experience for architects with its modular pattern editor.

The new Façade Design workflow contains the whole design workflow from concept through design development to documentation supporting local standards fully supported with BIM.”
New features of ARCHICAD 22: The renovated Façade Design workflow offers a adjustable design environment for architects to produce external or internal façades with modular structures and hierarchical, simply modifiable patterns. ARCHICAD-Grasshopper Connection is also significantly improved and it supports both conventional and algorithmic workflows.
The improved Profile Editor simplifies the process for generating intelligent profiles for columns, beams and walls and manage the shapes and sizes of their cross sections through BIM parameters.
The brand-new Expression Defined Properties significantly enhance the power of ARCHICAD to control the “I” in BIM. GRAPHISOFT’s patent pending Machine Learning (ML) algorithm modifies 2D navigation to each project’s content and leads to a very smooth and responsive navigation.

ARCHICAD 22 also comprises of Maxon’s latest (R19) CineRender engine that produces stereoscopic or 360° spherical renderings; a superior Teamwork experience because of rapid element reservation; and greater quality and accuracy while exporting building component information from composite skins and complex profiles – with OPEN BIM standards.
ARCHICAD 22 also offers various othr performance and functional enhancements. To get more information, please visit www.graphisoft.com/archicad


~~~~~~~~~~~~~~~~~~~~~~~~
Published By
Rajib Dey
www.bimoutsourcing.com
~~~~~~~~~~~~~~~~~~~~~~~~

Sunday, April 22, 2018

InfraWorks Collaboration Enterprise cloud collaboration with BIM 360

Various teams can now connect on InfraWorks models with the help of Autodesk BIM 360 platform to provide companies better managing project data and controlling access to project-specific libraries with roles and permission settings. Users can now select a BIM 360 project for storing new InfraWorks models made with Model Builder and Team members can also take advantage of the BIM 360 document management functionality to view and profit valuable project data.

Autodesk is very popular and best known for AutoCAD but it also developing big range o software for every creative field as well as a line of software for consumers such as Sketchbook, Homestyler and Pixlr. They are also creating some educational version of its software with no cost for qualified students and staff through Autodesk Education Community. They also have some digital prototyping software such as Autodesk Inventor, Fusion 360 and the Autodesk Product Design Suite which are used in the manufacturing industry for visualizing, simulating and analyzing real-world showing a digital model in the design process. Autodesk apps can be used in the iPhone, iPad, iPod and Android and the company continuously more accessible design technology for both professional and new designers, homeowners, students and casual creators whoever wants to make and share their ideas with the outer world.

BIM 360: BIM 360 enhances construction project delivery by supporting informed decision-making throughout the project lifecycle; it also connects the people, data and workflows on every project by doing design collaboration, documentation and reviews etc.

Here are the newest features that can be used by users of BIM 360 and InfraWorks:

Shared Views: These are a quick and simple way for sharing InfraWorks models online without investing in an enterprise-level solution such as BIM 360.

Terrain Contours: These displays has been upgraded with view-based settings to navigate the presentation and visibility of contour lines and elevation text labels or specific major and minor contour intervals can be set to show wile zooming in past a certain point.

Parametric tunnels: InfraWorks is now allows parametric tunnel component parts and groups and users can design tunnels in the context of a total infrastructure project and they can be designed in Autodesk® Inventor® for further use and import into InfraWorks.

Detailed bridge design: InfraWorks road alliance and span end lines can be sent to an Autodesk Structural Bridge Design model to allow a bridge designer or engineer to make a more detailed model and execute refined analysis.

Consolidated road modeling: InfraWorks can consolidate modeling tools; planning roads are for visualization of large networks and component roads are for introductory engineering; in this new release all previous design roads will be automatically transformed to component roads.


Interoperability-
Dynamic integration with Revit: InfraWorks bridges can be actively updated in Revit whenever users modify a bridge in InfraWorks and they will get an option of matching the InfraWroks bridge which avoids losing all the detailed design work that has been done previously in Revit.
InfraWorks Collaboration Enterprise cloud collaboration with BIM 360
Import InfraWorks roads as Civil 3D corridors: While importing component roads from InfraWroks to Civil 3D they will automatically become corridors with surfaces and subassemblies and give users the improved design capabilities that offer by component roads while supporting more strong interoperability with civil 3D.

Civil 3D 2019 (Design) - Fixed vertical curves with high or low points: Civil 3D users now can specify a new kind of fixed vertical curve in an alignment profile to specify a low or high point enabling them for starting the profile design from a specific point. This feature also helps users for developing the rest of a design from a known point and stick to that design constraint in the entire design process.

Rail cants supported in Subassembly Composer: Rail subassemblies that are created in Subassembly Composer now get that ability to read the cant which has been calculated on the alignment and then those cant values are used to build a corridor that can reflect the calculated cant.

Drawing Production - Batch Saves: Now various drawings and template files can be viewed and saved to the newest versions of Civil 3D using the Autodesk Batch Save Utility; custom scripts can now also add in the batch operation which will save time while shifting a project to a newer version of Civil 3D.

Drawing Comparison: The new AutoCAD DWG Compare and identifies and visually shows the differences between two drawings; moreover that the modified, added or removed objects are shown in a new comparison drawing using different colors to show the differences.

~~~~~~~~~~~~~~~~~~~~~~~~
Published By
Rajib Dey
www.bimoutsourcing.com
~~~~~~~~~~~~~~~~~~~~~~~~

Friday, May 19, 2017

Heritage BIM Is Ideal For Documentation And Development Of Historical Structures

The application of Building information modeling (BIM) becomes more versatile when it offers huge benefits in the documentation and development of historical structures in a system known as historical BIM (HBIM). The process is complicated for transforming point clouds into a 3D model as there are lots of asymmetrical geometries in the concerned buildings. So, various semi-automatic parameterization tools are required.

Historical building information modeling (HBIM) stands for a semantic-aware database of historical buildings, through which the geometric model is associated with explanatory multi-source information. Historical buildings generally comprise of stratified artifacts along with non-regular and complicated geometry, contrasting to present constructions which normally contain regular geometry. Reality-based spatial data that is generated from cutting-edge geomatics 3D modelling methods can deliver a perfect replica of those buildings, containing all the related information, even though the diversified characterizing shapes are a big challenge at the time of modeling the geometry. Often these shapes are remodeled by hand, as there are limitations for impressive automatic recognition. The aims, structure and scale – and consequently the projected level of detail of the model – significantly impact the system to data acquisition (sensors, accuracy) and data processing.

The workflow for HBIM projects commence from data procurement from different sensors in relation to the necessity of context and the projected outputs. Then, the surveyed point clouds should have been pre-processed and curtailed with different systems and standalone software, and possibly modified for segmentation by means of automatic or semi-automatic object recognition into a BIM platform. Besides, elements are modeled and transformed into an approximation of reality in line with parametric rules, so it is likely to adjust each illustration of the model. As a final point, the shapes and the identities of objects should be associated with proper and sound relationships in accordance with the semantic definition of entities. After this, the model is ready to be explored with other information for analysis and monitoring over time. On the other hand, the manual creation of 3D models linked to as-built BIM is complicated and laborious. As the costs and skills necessary for manipulating the data signify that this approach is not justifiable and more automatic or semi-automatic tools for parameterization of metric and non-metric information are essential.

BIM platforms come up with some standalone embedded tools or plug-ins toward 3D modellers, viewers, analysers. They facilitate the best use of point cloud and processing with the intension of generating geometric modelling, feature extraction and parameterization in heritage buildings. Some commercial ones comprise of ArchiCad BIMx by Graphisoft, Scan-to-BIM by IMAGINiT, Revit by Autodesk, BIM360 by Autodesk, Recap by Autodesk, PonitSense by FARO, Leica CloudWorx, Green Spider, Bentley MicroStation V8i and Tekla Structures. Some open-source alternatives are Edificius, Tekla BIMsight and Autodesk Navisworks Freedom by IMAGINiT.


To read the complete article, go through the following link gim-international.com

Heritage BIM is ideal for documentation and development of historical structures

~~~~~~~~~~~~~~~~~~~~~~~~
Published By
Rajib Dey
www.bimoutsourcing.com
~~~~~~~~~~~~~~~~~~~~~~~~

Thursday, December 29, 2016

What Is 5D BIM And Its Benefits

5D BIM demonstrates completely valued parametric building components inside a virtual model in real time. With 5D BIM, it is possible to generate models which show how modifications with materials, layouts, square footage and other design elements influence the display of a facility as well as the cost and schedule of construction (dimensions four and five). It’s similar type of Macro BIM, a technology that is used by estimators to model facilities at the initial phase of design.

5D Macro BIM connects the creative form of design with the strategic function of a building’s architecture, and makes the process more apparent. 5D Macro BIM allows you to model and evaluate all the imaginative things like inventive design concepts, concise exterior finishes, unprecedented layouts, distinctively shaped and aligned departments and floors in different sizes. The costs are evidently apprehended to materials, labor or soft costs.

Benefits of 5D BIM :-

• Understand the scope of the projects in a superior manner with visual and data modeling capabilities. The costs are driven by formulas on every building system on the basis of the certain design, materials, site conditions, phasing and other parameters with reference to the owner’s timeline.

• The project team members will be able to easily understand the projected design, assumptions and cost drivers. They can obtain a transparent and perfect description of scope, cost and schedule upon which funding decisions are taken.

• Data is achieved in real time once the model is developed or modified. Substitute perceptions can also be easily searched, when owner and project team can get the cost and other data disclosed instantly. It radically reduces design and estimation cycle time. With authentic, perfect updates in real time, the efficiency is enhanced.

• Databases allow leveraging historical data as well as industry experience. Data can be utilized from particular sectors like healthcare or distribution center construction.

• All the interested parties associated with the project can visualize the end product and properly understand what’s comprised in the budget.

• The construction costs are modified automatically in real-time with the alteration in the model. “What-if’s” turns to be productive and captivating solution missions for the project team members, specifically the owner.


What is 5D BIM and its benefits
Image Courtesy: www.tekla.com
~~~~~~~~~~~~~~~~~~~~~
Published By
Rajib Dey
~~~~~~~~~~~~~~~~~~~~~

Wednesday, December 28, 2016

The Mac OS Users Can Download Free Version Of Grasshopper-ARCHICAD Live Connection

GRAPHISOFT, the trusted name in developing Building Information Modeling (BIM) for architects, has launched its intelligent GrasshopperARCHICAD Live Connection for the Mac OS. The first ever bi-directional "live" connection facilitates Rhino and Grasshopper users to be associated with a professional BIM software (ARCHICAD) on both the Windows and Mac platforms.

Rhino-Grasshopper-ARCHICAD connections empower the architects to use the power of the three design programs Rhino, Grasshopper and ARCHICAD and reduce the interval in the design practice among initial phase of design and Building Information Modeling (BIM). Now, Mac users will be able to avail this unique connection with the tools apart from continuous bi-directional geometry transmission and transform basic geometrical shapes to into complete BIM elements, whereas keeping algorithmic editing functionality same.

"We're pleased to offer this revolutionary algorithmic design-to-BIM workflow to our Mac users as well," said Peter Temesvari, Director of Product Management, GRAPHISOFT. The designers can now produce superior design with this revolutionary algorithmic design-to-BIM workflow integrated with the greater architectural BIM solution that operates on Mac platform.

The users can click on the following link to download the free Grasshopper-ARCHICAD Live Connection plug-in for ARCHICAD 20.




~~~~~~~~~~~~~~~~~~~~~~
Published By
Rajib Dey
~~~~~~~~~~~~~~~~~~~~~~

Wednesday, December 21, 2016

RTV Xporter For Revit Can Automate Your BIM Process

With RTV Xporter for Autodesk Revit, the users will be able to export and print drawing sheets and views in Autodesk Revit automatically. RTV Xporter contains user-friendly interface to instantly look over, explore and filter Revit drawing sheets and views. Besides, the users can generate PDFs, DWG, DWF, DWFx, DXF and IFC files automatically. With RTV Xporter’s in-built parametric file naming engine, it is possible to automatically saves the exported files to fit any company’s or project team’s file naming conventions conveniently. RTV Xporter also provide support for batch printing to two separate printers concurrently to facilitate the project teams to have sufficient time for designing and coordinating their BIM projects. RTV Xporter is specifically designed for Architects, Interiors Designers, Engineers, Landscape Architects and Visualization Artists who use Autodesk Revit.

The PRO version of the RTV Xporter product facilitates the users to generate and carry out ignored scheduled tasks and batch processes in Autodesk Revit.

The PRO version can scan current Autodesk Revit projects for 2D Drafting Views and automatically remove and save them as separate Revit files, facilitating the users to mine data and content for your BIM projects without any difficulty.

With PRO version, the users can automatically name their exported digital files on the basis of parameters drawn out from their Revit project, along with shared and project parameters linked with Revit Views or Sheets. It will facilitate the users to 'set and forget' the projects file naming syntax while generating any digital documentation.

Batch print large format and abridged hardcopies to two individual printers at the same time.



To get more information, visit https://www.rtvtools.com/

~~~~~~~~~~~~~~~~~~~~~
Published By
Rajib Dey
~~~~~~~~~~~~~~~~~~~~~


Friday, December 2, 2016

How BIM Was Utilized In £500M M8 M73 M74 Motorway Improvements Project In Scotland

The following construction video briefly demonstrate how BIM was utilized to create the replica of Raith Interchange, The £500M M8 M73 M74 Motorway Improvements Project in Scotland.

Besides, serving to gaming industry as well as facilitating design, build, maintain and manage construction projects, BIM becomes also very useful for major roadway projects.

Intelligent 3D models of new infrastructure consist of everything from the underground location of utility services to the type of street lighting installed as well as replacing the wattage of a bulb is also done by applying BIM.

BIM was applied to perform clash detection analysis, time-lapse visualizations and many other features which enhance project collaboration and co-ordination process significantly.

In the Raith Interchange project, BIM enhances communication and coordination among design and construction teams and leads to superior and more compliant infrastructure and save considerable time and money. Improved communication with road users and local communities is another major advantage with the use of BIM.


~~~~~~~~~~~~~~~~~~~~~
Published By
Rajib Dey
~~~~~~~~~~~~~~~~~~~~~

Tuesday, October 4, 2016

How UHS Henderson Hospital Project Completed Successfully With BIM

BIM was implemented in UHS Henderson Hospital project to assign best time for design to fulfill the customer expectation devoid of curtailing the scheduled time allocated for the jobsite to finish the construction.

The engineers and detailers co-operated throughout the design process to generate design deliverables and shop drawings from the similar 3D-BIM model.

To execute the task, the project team generated a construction-level model devoid of slowing the schedule of the design. Superior quality documents with all engineering and construction information were created devoid of making the documents complicated with enormous finely detail.

Given below the detailed descriptions of the process:-

1. Engineers collaborated with the designers to produce initial drawings and sketches which were applied to organize the final model. As the engineers were drafting a very low level of detail (LOD 100), they can easily respond to the modifications of design as well as fulfill the satisfaction of the customers. Furthermore, as the detailers were outlining the systems throughout design rather than after, they can easily raise queries and obtain solutions previously devoid of the requirement of a request-for-information process. They can also accomplish most of the coordination prior to clash detection started.

2. Various field general foremen performed the modeling for the shop drawings prior to assemble them on jobsite. At the time of issuing Construction (IFC) sheets, foremen already recognized the job and didn’t have to spend prolonged time for solving issues associated with the project.

3. The shop foremen generated spool drawings for the assemblies which they were fabricating to minimize rework as they were capable of accessing the BIM model to resolve their queries at any time.

4. Engineers compromised with the design team to apply one-quarter scale design drawings in order to use the similar sheet layout and text size. This facilitated to utilize the identical annotation, notes, and sheet setup for the detailing and engineering drawing deliverables.


How UHS Henderson Hospital project completed successfully with BIM
Image Courtesy: thebimhub.com
~~~~~~~~~~~~~~~~~~~~~
Published By
Rajib Dey
~~~~~~~~~~~~~~~~~~~~~

Thursday, August 18, 2016

How BIM was utilized to make 18000 square foot One West Park project successful

Building Information Modeling (BIM) was utilized in three-dimensional rendering of 18000 square foot One West Park situated in just south of Forsyth Park to house the law firm of Bouhan Falligant LLP.

BIM facilitates the architects to draw various angles and views of a project as the size, scale and proportions can be easily understood with the BIM based 3D model. The result produced can save significant time, money and headaches for the clients as soon as the construction starts.

It is expected that the construction of the building will be completed within one year.


~~~~~~~~~~~~~~~~~~~~~
Published By
Rajib Dey
~~~~~~~~~~~~~~~~~~~~~

Monday, June 20, 2016

GRAPHISOFT launched ArchiCAD 20 for improved BIM workflow

Archicad 20, the most updated mobile based version of GRAPHISOFT’s flagship software, is just launched.

ARCHICAD 20 contains the following advanced features :-

The users can preserve all suitable project information inside a BIM model together with data that wasn’t formed in CAD or BIM tools. By using “Mass property value import” functionality, the software can import and export Excel data semi-automatically. It minimizes the risk of human error while entering consultants’ data.
The software is also able to lessen the requirements of customary additional 2D CAD work through a graphical override that facilitates the users to modify the illustration of any 2D and 3D views for elements containing identical properties.

ARCHICAD 20 is also considered as one of the newest BIM applications that is compatible with IFC 4 open-source standard to offer new coordination workflows like Design Transfer View and Reference View. It also provides complete support for BIM Collaboration Format and DXF/DWG roundtrip conversion. Besides, it supports COBie (www.caddigest.com).

For more information, visit www.graphisoft.com


~~~~~~~~~~~~~~~~~~~~~
Published By
Rajib Dey
~~~~~~~~~~~~~~~~~~~~~

Wednesday, June 15, 2016

Graphisoft launched ArchiCAD 20

Graphisoft is going to launch the most updated version of its exclusive BIM software alias ARCHICAD 20. The newest version is considered as the most graphically advanced BIM program in the industry that gives emphasis on the “I” in BIM.

A significant part of this information is non-geometrical data. ArchiCAD 20 provides robust functionalities to control, visualize and exchange non-geometrical data with the project stakeholders involved in the design and construction progression.

Given below some of the newest features in ARCHICAD 20:
Enhanced Information Management

• Preserve the Information: ArchiCAD 20 facilitates the architects and designers to acquire the maximum information from BIM by using their Building Information Model as the primary storage hub for all interrelated information. The design information can also be preserved and organized which was produced by other tools like excel spreadsheet except CAD or BIM.

• Display the Information: ArchiCAD 20 pulls well-organized information for informatory design visualization, which can make design and construction process more efficient. By applying smart filters and latest graphical override, designers get the ability to smoothly and independently modify the demonstration of any 2D and 3D views of elements maintaining identical properties. This feature offers a wide array of workflows to optimize the communication, coordination and model checking process.

• Distribute the Information: ArchiCAD 20 is the first ever BIM program that is compatible with the IFC 4 open-source standard. IFC 4 is well versed with new coordination workflows (Design Transfer View and Reference View) and provides assistance for coordinating with other disciplines. Distribution of Information through purpose-made tools like BIMx or generic tools like Excel facilitates a much broader target group to join in and obtain the huge information preserved in BIM.
GRAPHISOFT ArchiCAD 20 is expected to be launched in June, 2016.

Download ArchiCAD 20

For more information visit, visit www.archicad.com

Graphisoft launched ArchiCAD 20
Image Courtesy: youtube.com
~~~~~~~~~~~~~~~~~~~~~~
Published By
Rajib Dey
~~~~~~~~~~~~~~~~~~~~~~


Wednesday, June 8, 2016

Follow Periodic Table Of BIM To Implement BIM Successfully

The Periodic Table of BIM offers a useful guidance with the steps essential for employing BIM successfully.

This BIM table provides all the primary elements of BIM in an understandable, visual reference that is useful for printing or sharing.

Given below the detailed analysis of this periodic table of BIM

Strategy
Specify your BIM STRATEGY and recognize what is the outcome of implementing BIM. Think of the process and time for employing the strategy - and the auxiliary foundations, processes, technology, tools and people which are essential.
Read more about the BIM STRATEGY grouping.

Foundations
Develop FOUNDATIONS of well-organized systems for communication, information exchange, and data transfer, to enforce progressive BIM methods.

Formulate an approach to control the production, distribution, and quality of construction information and select the exact route for procurement that will arrange the suitable surroundings for collaboration.
Set your existing BIM know-how and functionality to define your BIM preparation status and consider the prospective revisions in near future.
Read more about the FOUNDATIONS grouping.

Collaboration
Produce superior and more competent methods of working and concentrate on COLLABORATION.
To reap the advantages out of coordinated information, choose the digital tools useful for making collaboration efficiently together with the viewpoints of people which may necessitate cultural and behavioural variations.
Read more about the COLLABORATION grouping.

Process
Suggest how and where you can make significant developments in your existing PROCESSES.
Recognize what a best-practice workflow should become as well as make sure that information is unanimously planned irrespective of author.
Well versed with information requirements throughout the entire project life cycle in order that greatest value is obtained through the complete project time line.
Read more about the PROCESS grouping.
To get the complete article, visit here

The new BIM guidelines

~~~~~~~~~~~~~~~~~~~~~~
Published By
Rajib Dey
~~~~~~~~~~~~~~~~~~~~~~

Friday, June 3, 2016

Build Earth Live is organizing a collaborative BIM competition on the newest hyperloop concept

Global design and BIM software developer Vectorworks, Inc, performs as the sponsor of the collaborative BIM competition that will start on Monday 23, 2016 at noon ET and complete on May 25, 2016 at noon ET. The designers from all over the world are welcomed to develop a plan for connecting Dubai and Abu Dhabi with the help of latest hyperloop concept. The theme of the competition is how new technology is reforming construction. All the participating teams have to coordinate with them to perform collaborative work with the use of building information modeling (BIM) technology. The event will specifically focus on the design of station terminuses inside the context of two global cities.

It is titled as the eighth collaborative BIM competition organized by Build Earth Live to spread out the concept of cloud-based working, international advancements in interoperability and public access to the design process.

The participating teams will be able to utilize any interoperable technology as well as maintain a public collaboration site so that visitors can witness and comment on the process.

The event will be finished with an awards ceremony and presentations to the press. Award winners will be acknowledged as leaders in their field and masters of collaborative technologies.

For more information visit, www.asite.com

Build Earth Live

~~~~~~~~~~~~~~~~~~~~~~
Published By
Rajib Dey
~~~~~~~~~~~~~~~~~~~~~~

Wednesday, April 6, 2016

Brief overview of Adaptive Fabric Roof Canopy

This Revit video tutorial briefly explains Adaptive Fabric Roof Canopy. This tutorial will guide you to develop your own high quality parametric family in Revit. This tutorial is taken directly from BIM After Dark - Volume 3 that solely focuses on family and content formation with Revit.

Learn how to generate a practical family that establishes the foundations of adaptive components.

After that one will learn how to build on the basis of these concepts and include some intricacies like parameters and hosting to a divided surface (empowering you to develop forms like "The Web.)


~~~~~~~~~~~~~~~~~~~~~
Published By
Rajib Dey
~~~~~~~~~~~~~~~~~~~~~