Cost Estimating Sand & Cement Using Revit

 A purpose-built BIM solution like Revit features computable building information that enables a model to be understood by a computer as a building. A wall for example, "knows" what it is and how to react to the rest of the building.

As such, it can be scheduled or quantified as a wall: a building assembly made of real materials. Computable building information supports numerous building design and construction activities: structural analysis, MEP system modeling, building energy analysis, and specification management, to name just a few.

Cost estimating is yet another aspect of the building process that can benefit from computable building information. Designing a building is the responsibility of architects, whereas assessing the cost to build it is the domain of estimators. In general, the architect’s scope of work doesn’t extend to material takeoffs or cost information. That’s left to the estimator.

When preparing their cost estimates, estimators typically begin by digitizing the architect’s paper drawings, or importing their CAD drawings into a cost estimating package, or doing manual takeoffs from their drawings.

All of these methods introduce the potential for human error and propagate any inaccuracies there may be in the original drawings.

By using a building information model instead of drawings, the takeoffs, counts, and measurements can be generated directly from the underlying model. Therefore, the information is always consistent with the design. And when a change is made in the design – a smaller window size, for example – the change automatically ripples to all related construction documentation and schedules, as well as all the takeoffs, counts, and measurements that are used by the estimator.










~~~~~~~~~~~~~~~~~~~~~~~~