adsense analytic

Showing posts with label Engineer. Show all posts
Showing posts with label Engineer. Show all posts

Monday, November 19, 2018

A position is vacant for BIM analyst in US locations

BLDGWORKS, a growing construction integration, real estate development, and architecture firm, is inviting applications for the position of a BIM analyst on full time basis for the locations of New York, NY, US.

The objective of BIM Analyst is to employ virtual projects controls with a large corporate client involved in a large portfolio of work around the world. The BIM Analyst has to make design and construction of Building Information Models to facilitate QTO and cost analysis.

This role provides the scope toward any member of the Architect / Engineer / Construction community with an interest in BIM (3D,4D,5D modeling) to fully employ and delve into these methods of documentation.


Academic Experience:
• Degree in architecture, engineering, construction, project controls, or related fields required
• 0-3 years experience with BIM platforms (mainly Revit)
• Interest in project controls, QTO, and cost analysis
• Exhibition of leadership skills
• Capability to think innovatively and strategically to provide solutions
Technology Experience and Expertize:

• Experience with Revit highly desired
• Experience with Rhino preferred but not essential
• Experience with Dynamo will give added advantage but not essential
• Experience with Python scripting will give added advantage but not necessary
• Experience with Revit API will give added advantage but not essential
• Salary structure will be equivalent to experience.
• Contribution to healthcare
• Paid Time Off
BLDGWORKS inspires the employees to perform towards NCARB licensure, AIA membership, and other certifications like LEED. If any candidate possesses any such licenses and certifications, he/she will get special consideration.
Prospective candidates should send a cover letter, resume, and portfolio along with salary requirements to office@bldg-works.com
A position is vacant for BIM analyst in US locations
~~~~~~~~~~~~~~~~~~~~~~~~
Published By
Rajib Dey
www.bimoutsourcing.com
~~~~~~~~~~~~~~~~~~~~~~~~

Wednesday, August 10, 2016

The Revit & Sketchup users can apply flux to integrate excel data with Revit & Sketchup models

Flux facilitates the users to adjust column schedules in excel and bring Revit model up-to-date automatically. Flux allows interoperability among your design application in real time as well as transmits data safely through the cloud. Flux also facilitates multi-user workflows and scopes for new collaboration through an exceptional functionality of flux.

Flux provides cloud-based collaboration tools for architects, engineers, and contractors to exchange data and streamline complex design workflows. Flux acts as an interchange point for sharing project data such as the architectural program, schematic designs, analysis models, and material schedules.

Flux plugins presently support Excel, SketchUp, REVIT, Grasshopper and Dynamo to exchange data among these applications through web.

To download Flux, visit flux.io/signup


~~~~~~~~~~~~~~~~~~~~~~
Published By
Rajib Dey
~~~~~~~~~~~~~~~~~~~~~~

Monday, April 18, 2016

Global Parameters – An exclusive new feature of Revit 2016 – R2

This Revit video will guide you making your design superior with Revit as well as make Revit 2016 as an indispensible tool for the architect, engineer or seller. The video specifically focuses on a new feature called Global Parameters in Revit 2016 – R2.

Revit 2016 R2 contains various new features and advancements. The students as well as Autodesk Maintenance and Desktop Subscription customers can only access these features for Revit 2016 software releases.

Global parameters: Global parameters convey the benefits of parametric families into the project environment to fulfill the objectives of the design in a superior way. The global parameters can be developed on the basis of a single project file which is not allotted to categories.


The global parameters can be applied to input the value of a dimension or a constraint, relating to an element instance property to put its value, or report the value concerning a dimension, in order that the value is applied in the equations of other global parameters.

For more information on Global Parameters, visit help.autodesk.com


~~~~~~~~~~~~~~~~~~~~~
Published By
Rajib Dey
~~~~~~~~~~~~~~~~~~~~~

Friday, January 29, 2016

Brief Overview of Model Based Definition (MBD)

MBD represents model-based definition. MBD offers similar functionalities of PIM, or product information modeling. It offers unconventional way to dimension parts in both 2D and 3D.

It is the procedure of applying various 3D models like solid models, 3D PMI and related meta data inside any CAD software to offer specifications for specific components and product assemblies. There are various kinds of information in MBD which range from geometric dimensioning and tolerancing (GD&T), component level materials, assembly level bills of materials, engineering configurations, design intent, etc.

MBD facilitates to put both traditional and GD&T dimensions on the 3D model itself throughout the design phase. The engineer or designer can arrange these dimensions on the model for diversified applications.

Modern 3D CAD applications take into account the inclusion of engineering information like dimensions, GD&T, notes and other product details inside the 3D digital data set concerning components and assemblies. MBD applies such attributes to organize the 3D digital data set as the basis of these specifications and design authority for the product. The 3D digital data set may comprise of adequate information to manufacture and examine product devoid of any engineering drawings.

In several cases, applying some information out of 3D digital data set (e.g., the solid model) facilitates fast prototyping of product through different methods like 3D printing. A manufacturer can supply 3D digital data directly to manufacturing apparatuses like CNC machines to manufacture final product.

To learn more, go through the following exclusive article on MBD

Model Based Definition

~~~~~~~~~~~~~~~~~~~~~~
Published By
Rajib Dey
~~~~~~~~~~~~~~~~~~~~~~

Tuesday, August 11, 2015

Hunt Construction Group uses Multivista’s newest technology to improve their BIM workflow significantly

Multivista South Florida, the most recognized visual construction documentation company, in Delary Beach is now is making alliance with Hunt Construction Group to integrate its photo documentation with its BIM project model.

HCG manages various construction projects in South Florida and has developed its service through amalgamation with Multivista’s latest technology. With this consolidation, project photo documentation can be connected directly with Autodesk®, Revit®, Navisworks® and BIM 360 TM Glue/Field. The Multivista BIM unification program was initiated in April 2015 which transforms Multivista’s client documentation to their BIM model for making comparison between physical and modelled conditions.

As per opinion of Pat Delano, G.M.,Hunt Construction Group, photographic documentation is useful to communicate in real time and the owner can get the detail information concerning what was set up for operating purpose in near future. Besides, by integrating photos to the plans, it becomes possible to settle a specific area or issue in quickest possible way effortlessly & efficiently which bring huge advantage to all project stakeholders.

Mutual application of authentic & complete construction photo documentation and BIM technology is broadly acknowledged as it provides the best solution to the construction industries. As per opinion of Kyle Goebel, Assoc. DBIA, virtual construction Engineer for HCG, QA and QC process has been greatly streamlined with the application of Multivista’s BIM integration program.

Multivista® Photo documentation can be directly accessed and synchronized from cloud-based BIM model through BIM 360 TM Glue. The actual position of photo documentation can also be verified all through the coordination meetings and it helps the project team members to check the condition of construction devoid of visiting the jobsite physically as the verification can be done with the photos linked to the BIM model. It saves significant times for the project team members.

Multivista expanded the program co-actively with their clients who made a huge investment in BIM workflows.

BIM workflow significantly
Image Courtesy: geometrygym.blogspot.com


~~~~~~~~~~~~~~~~~~
Published By
Rajib Dey
~~~~~~~~~~~~~~~~~~