Primary function of BIM Model related with information gathering. Throughout the stage, information will be collected and developed into a BIM Model that contains conceptual and schematic level information about the project. To give the visual understanding of the intended design, a conceptual model with key elements in the BIM model will have been produced.
The second phase of the BIM model represents analysis stage. This stage will focus on “The Right Fit” for the client. The client’s requirements will be fully acquired during this stage, with all analytical analysis including within the BIM model. The team populates the BIM model with all the proper systems, equipment, information, and requirements for the facility then. Constructability will be a key concern on this stage, with conflict checks being run by the entire team. User group assembling really facilitates to define this essential stage of the process.
The third phase involves implementation of BIM construction documents to structure of the facility. The construction documentation process should be fluid because the team has given emphasis on the constructible BIM model. Since everyone has worked as a team from the beginning of the project, delays and surprises during the construction phase are greatly reduced.
We find the facility management aspect of the BIM model in the fourth stage. A BIM model can be more than just a tool for construction. Having an accurate As-Built or As Constructed BIM model can lead to many advantages for the facility maintenance personnel. Part of the BIM deliverable should be to train the maintenance personnel on how to use the BIM model for future facility maintenance issues. Facility maintenance from a BIM model is an arising trend in our industry, as well as, a powerful tool for our clients.
Posted by Rajib Dey
Business Development
rajib@jobs2india.com
Global Associates (Pioneer Company in 3D modeling with BIM & Sketchup)
No comments:
Post a Comment