adsense analytic

Wednesday, October 5, 2016

Some Useful Tips On Autocad User Interface

The following autocad article provides some useful autocad tips to maintain the standard workspace.

Tricks for AutoCAD user interface - Learn how to deactivate the ribbon and produce a minimum workspace:

1. Give command RIBBONCLOSE
2. Give command MENUBAR 1
3. Select the Tools menu > Toolbars > AutoCAD > Layers
4. Select the Tools menu > Toolbars > AutoCAD > Properties
5. Lots other can be included as per requirements
6. Dock the toolbars at the top of the drawing area
7. Give command MENUBAR 0
8. Click the Workspace button and Save Current As ..., label it “Minimal” or whatever

It is possible to toggle amid workspaces with the similar button. Various workspaces can be saved for diverse projects.
The following tricks should be applied if an interface element is just hanging around with nothing to do.

• Not applying the Viewcube? Give command NAVVCUBEDISPLAY 0
• Not applying the navigation bar under the Viewcube? Give command NAVBARDISPLAY 0
• Unemployed buttons on the status bar in the lower-right side? Select the Customization menu in the utmost lower-right corner, and deactivate the unnecessary ones.
• If it is necessary to show some more buttons on the Quick Access toolbar at the top left. Select the drop-down button located at right side of the toolbar and select the ones as per your choice.
To avail the extra interface elements, open the OPTIONS dialog box and click the Display tab. It is also possible to rectify the buttons on the toolbars and ribbon tabs.

If you want to gather more information on the AutoCAD user interface, go through the following resources :-

Autodesk Knowledge Network articles:
• About User Interface Customization
• About the Customize User Interface (CUI) Editor
AutoCAD Blog posts:
• Video of the Month: AutoCAD 2017 Classic Workspace. Miss It?
• Bring Back Dialog Boxes with Classic AutoCAD Commands


Some useful tips on Autocad user interface
Image Courtesy: thebimhub.com
~~~~~~~~~~~~~~~~~~~~~
Published By
Rajib Dey
~~~~~~~~~~~~~~~~~~~~~

Tuesday, October 4, 2016

How UHS Henderson Hospital Project Completed Successfully With BIM

BIM was implemented in UHS Henderson Hospital project to assign best time for design to fulfill the customer expectation devoid of curtailing the scheduled time allocated for the jobsite to finish the construction.

The engineers and detailers co-operated throughout the design process to generate design deliverables and shop drawings from the similar 3D-BIM model.

To execute the task, the project team generated a construction-level model devoid of slowing the schedule of the design. Superior quality documents with all engineering and construction information were created devoid of making the documents complicated with enormous finely detail.

Given below the detailed descriptions of the process:-

1. Engineers collaborated with the designers to produce initial drawings and sketches which were applied to organize the final model. As the engineers were drafting a very low level of detail (LOD 100), they can easily respond to the modifications of design as well as fulfill the satisfaction of the customers. Furthermore, as the detailers were outlining the systems throughout design rather than after, they can easily raise queries and obtain solutions previously devoid of the requirement of a request-for-information process. They can also accomplish most of the coordination prior to clash detection started.

2. Various field general foremen performed the modeling for the shop drawings prior to assemble them on jobsite. At the time of issuing Construction (IFC) sheets, foremen already recognized the job and didn’t have to spend prolonged time for solving issues associated with the project.

3. The shop foremen generated spool drawings for the assemblies which they were fabricating to minimize rework as they were capable of accessing the BIM model to resolve their queries at any time.

4. Engineers compromised with the design team to apply one-quarter scale design drawings in order to use the similar sheet layout and text size. This facilitated to utilize the identical annotation, notes, and sheet setup for the detailing and engineering drawing deliverables.


How UHS Henderson Hospital project completed successfully with BIM
Image Courtesy: thebimhub.com
~~~~~~~~~~~~~~~~~~~~~
Published By
Rajib Dey
~~~~~~~~~~~~~~~~~~~~~

Saturday, October 1, 2016

Top 3 Benefits Of BIM

BIM, or Building Information Modeling offers a slew of advantages which can transform the way on which the AEC industry is based, from the design progression to the life cycle of a structure. Given below, top 3 advantages of BIM technology.

Collaboration: BIM technology facilitates the professionals to perform jointly & harmoniously on a project as well as collaborate simultaneously to allocate data like complicated models and crucial information relevant to those models, consistently. By this collaboration method, the professionals can undertake quick and informed decision during the lifecycle of a project.

With the help of cloud software and apps like BIM360, professionals will be able to examine and make necessary modifications, notes and/or suggestions on the basis of the information provided into the model. BIM facilitates all collaborators to view the progression of the model physically all through the project planning phase when the modifications are occurred, as well as offers superior arrangement and project synchronicity prior to the commencement of the construction stage. Due to this improved collaboration, AEC professionals can work in tandem on various complicated projects.

Visualization: BIM offers powerful Visualization. By applying 3D modeling capability of BIM, the professionals can view a physical 3D model of the original project with one very vital detail. They can avail constant information concerning the structure from Architects, Engineers, Construction professionals and more.

Project schedules can be easily acquired, MEP(mechanical, electrical, plumbing) design details can also be obtained, details about materials & cost and more can be achieved in one central location toward all the project stakeholders on the structure.

Mitigating Errors: BIM technology can optimize the design and build process by reducing the errors significantly through clash detection or conflict resolution. Clash detection is a useful process to automatically identify where the models ‘clash’ - components of individual models capturing the similar space, or with parameters which are mismatched, or in 4D BIM modeling, a time sequence that is not working.

All these above methods facilitate to detect errors in advance which should be found prior to commencement of the construction process to maintain fewer errors, reduce costs, and most significantly, complete the project on schedule. These BIM tools can accelerate this process, that was once completed onsite, into the preplanning phase where collaborators can work out the problems devoid of any expensive errors.

Top 3 benefits of BIM


~~~~~~~~~~~~~~~~~~~~~~
Published By
Rajib Dey
~~~~~~~~~~~~~~~~~~~~~~